IBOV 185,992.03 ▲ 0.24% IPSA 11,381.18 ▲ 1.30% IPC MEX 63,507.11 ▼ 1.11% MERVAL 3,061,512 ▲ 1.08% COLCAP 2,521.85 ▲ 0.40% BVL PERÚ 58,965.05 ▲ 1.80% USD/BRL5.12▼ 0.57% USD/MXN17.15▼ 0.55% USD/CLP960.65▲ 0.54% USD/COP3,158▲ 1.16% USD/PEN3.37▲ 0.44% USD/ARS1,510▼ 0.21% USD/UYU40.20▲ 3.11% USD/PYG5,888▲ 2.09% USD/BOB9.75▼ 12.91% USD/DOP58.83▼ 0.03% USD/CRC444.45▲ 2.53% USD/GTQ7.63▲ 3.11% USD/HNL26.85▲ 3.22% USD/NIO36.62▲ 2.69% USD/VES845.33▼ 0.13% USD/PAB1.00— 0.00% USD/BZD2.00— 0.00% USD/JMD 157.28 — 0.00% USD/TTD6.74▲ 2.56% EUR/BRL5.88▼ 0.80% BRENT 88.88 ▼ 0.03% WTI 83.11 ▼ 0.11% IRON ORE 161.91 — — COPPER 6.61 ▲ 0.03% GOLD 4,461 ▲ 1.78% SILVER 65.59 ▲ 1.26% SOY 1,184 ▲ 3.20% CORN 480.50 ▲ 10.02% WHEAT 655.00 ▲ 3.93% COFFEE 317.25 ▼ 5.51% SUGAR 16.43 ▼ 1.79% ORANGE JUICE 138.55 ▼ 0.47% COTTON 85.03 ▲ 2.33% COCOA 5,719 ▲ 3.18% BEEF 223.60 ▼ 3.93% CATTLE 339.10 ▼ 3.16% LITHIUM 75.20 ▲ 1.47% PETR4 41.64 ▼ 0.05% VALE3 72.97 ▲ 0.83% ITUB4 38.60 ▼ 1.03% BBDC4 16.85 ▲ 0.36% ABEV3 14.89 ▼ 0.80% BBAS3 19.37 ▲ 0.47% B3SA3 14.26 ▼ 0.21% WEGE3 47.59 ▲ 0.49% PRIO3 59.14 ▼ 0.19% SUZB3 41.33 ▲ 2.35% RENT3 34.68 ▼ 0.09% AZZA3 15.89 ▼ 2.63% CSAN3 3.22 ▼ 1.83% RAIZ4 0.25 — 0.00% PCAR3 2.75 ▼ 0.36% GMAT3 3.65 ▼ 1.08% PSSA3 48.13 ▼ 0.54% CVCB3 1.33 ▼ 2.92% POSI3 3.36 ▲ 2.44% SLCE3 13.34 ▲ 0.30% NATU3 8.14 ▼ 0.73% IBOV 185,992.03 ▲ 0.24% IPSA 11,381.18 ▲ 1.30% IPC MEX 63,507.11 ▼ 1.11% MERVAL 3,061,512 ▲ 1.08% COLCAP 2,521.85 ▲ 0.40% BVL PERÚ 58,965.05 ▲ 1.80% USD/BRL 5.16 ▲ 0.01% USD/MXN 17.06 ▼ 0.24% USD/CLP 913.98 ▲ 0.04% USD/COP 3,140 ▲ 0.03% USD/PEN 3.36 ▼ 0.66% USD/ARS 1,493 ▲ 0.10% USD/UYU 40.27 ▲ 1.24% USD/PYG 5,939 ▲ 1.68% USD/BOB 11.64 ▼ 0.76% USD/DOP 58.34 ▲ 1.25% USD/CRC 445.92 ▲ 0.89% USD/GTQ 7.62 ▲ 2.21% USD/HNL 26.79 ▲ 1.57% USD/NIO 36.62 ▲ 0.69% USD/VES 762.44 ▼ 0.13% USD/PAB 1.00 — 0.00% USD/BZD 2.00 — 0.00% USD/JMD 157.28 — 0.00% USD/TTD 6.70 ▲ 0.61% EUR/BRL 5.95 ▲ 1.01% BRENT 88.88 ▼ 0.03% WTI 83.11 ▼ 0.11% IRON ORE 161.91 — — COPPER 6.61 ▲ 0.03% GOLD 4,461 ▲ 1.78% SILVER 65.59 ▲ 1.26% SOY 1,184 ▲ 3.20% CORN 480.50 ▲ 10.02% WHEAT 655.00 ▲ 3.93% COFFEE 317.25 ▼ 5.51% SUGAR 16.43 ▼ 1.79% ORANGE JUICE 138.55 ▼ 0.47% COTTON 85.03 ▲ 2.33% COCOA 5,719 ▲ 3.18% BEEF 223.60 ▼ 3.93% CATTLE 339.10 ▼ 3.16% LITHIUM 75.20 ▲ 1.47% PETR4 41.64 ▼ 0.05% VALE3 72.97 ▲ 0.83% ITUB4 38.60 ▼ 1.03% BBDC4 16.85 ▲ 0.36% ABEV3 14.89 ▼ 0.80% BBAS3 19.37 ▲ 0.47% B3SA3 14.26 ▼ 0.21% WEGE3 47.59 ▲ 0.49% PRIO3 59.14 ▼ 0.19% SUZB3 41.33 ▲ 2.35% RENT3 34.68 ▼ 0.09% AZZA3 15.89 ▼ 2.63% CSAN3 3.22 ▼ 1.83% RAIZ4 0.25 — 0.00% PCAR3 2.75 ▼ 0.36% GMAT3 3.65 ▼ 1.08% PSSA3 48.13 ▼ 0.54% CVCB3 1.33 ▼ 2.92% POSI3 3.36 ▲ 2.44% SLCE3 13.34 ▲ 0.30% NATU3 8.14 ▼ 0.73%
since 2009
Thursday, September 17, 2026

Africa Central Africa

Chad Says It Needs 8,000 Kilometres More Fibre, With Six Provinces Still Unconnected

By · September 17, 2026 · 5 min read

Africa Intelligence

One email, every weekday morning. African markets, politics and business — filed from our newsroom in Rio.

Yesterday’s subject line: “Kenya's judges void the US$1.6 billion Safaricom sale”

Free. We send a confirmation link first — nothing arrives until you click it. Unsubscribe with one click in any edition. If you stop opening us for 30 days we stop sending by ourselves, as we assume the interest is no longer there. See our privacy policy. We never share your email.

CHAD · TELECOMS

Key Facts

  • What happened Chad’s telecoms minister said the country needs about 8,000 kilometres more fibre for full coverage.
  • Who he told Farouk Mollah Banna, the World Bank’s resident representative in Chad.
  • What is missing Six provinces remain unconnected to the national backbone.
  • How few people are online About 87 percent of Chadians were not using the internet as of 2024, according to the telecoms union.
  • The single exit Chad’s only operational international connection runs through Cameroon.
  • What broke the other one The eastern link became inoperative because of the conflict in Sudan.

Eight thousand kilometres short, six provinces dark, and one working way out of the country.

Fibre optic cable, the infrastructure Chad says it still needs thousands of kilometres of
Fibre optic cable, the infrastructure Chad says it needs thousands more kilometres of (Photo: Profpcde, CC0 via Wikimedia Commons)
One-stop reference
Company Intelligence
Every listed company in Latin America — financials, ownership and structure for 1,450+ companies across 26 exchanges, in one place.
Browse the directory →
RT
Ask Rio Times
Latin American markets, currencies and companies.
Open the full Ask Rio Times →

Chad needs about 8,000 kilometres of additional fibre optic cable to cover its territory. Telecoms and digital economy minister Haliki Choua Mahamat gave the figure on 15 September 2026.

What the Minister Said

Haliki Choua Mahamat, Chad’s minister for telecoms and the digital economy, put the shortfall at about 8,000 kilometres of fibre. He gave the figure to Farouk Mollah Banna, the World Bank’s resident representative.

He also said six provinces remain unconnected to the national backbone. Chad is a landlocked country of roughly 1.28 million square kilometres.

How the Existing Network Is Built

Chad’s backbone runs along three axes, to the west, the south and the east. The infrastructure is state-owned and operated by Sotel Tchad and Sudachad.

The eastern axis has become inoperative because of the conflict in Sudan. That leaves the connection through Cameroon as the country’s only working international exit.

Why a Single Exit Is a Problem

A landlocked country reaches the global internet through a neighbour’s cable. With one route, any fault or political disruption there cuts the whole country off.

The World Bank has recommended new links toward Libya and the Central African Republic. Both would add redundancy that Chad currently does not have.

How Few People Are Online

About 87 percent of Chadians were not using the internet as of 2024, according to the International Telecommunication Union. That is among the lowest usage rates anywhere.

Mobile phone penetration stands at about 44.3 percent, while mobile internet use is about 12.6 percent. People have phones and do not have data.

What Coverage Exists on Paper

Second-generation mobile coverage reaches about 86.9 percent of the population and third-generation about 84.5 percent. Fourth-generation coverage reaches about 60 percent.

Chad’s population is roughly 25 million. Coverage figures describe where a signal exists, not who can afford to use it.

The Money Already Committed

The World Bank approved a digital transformation project for Chad on 25 September 2024. It combines a grant of about US$92.2 million with about US$30 million of commercial financing.

The project runs to a closing date of 30 April 2029. That is an administrative deadline rather than a construction target.

An Earlier Programme and Its Financier

A separate state modernisation programme handed over its first phase at Sarh in December 2025. It is valued at about 175.1 million euros, roughly US$205 million, covering 1,200 kilometres of fibre and a national data centre.

Financing for that programme is linked to Exim Bank of China. The 1,200 kilometres it covers is planned capacity rather than cable already in the ground.

The Regional Link

Chad also has a segment of the trans-Saharan fibre route. Published lengths for it differ between about 503 and 550 kilometres depending on the source.

The wider project is valued at about 79 million euros, of which about 29 million comes from the European Union. It is one strand of a cross-Sahara connection rather than a national solution.

What It Means on the Ground

For businesses in the six unconnected provinces, the practical position is that fixed broadband is unavailable. Operations depend on mobile data or satellite links.

For anyone planning work in Chad, redundancy planning is not optional. A single international route means outages are a question of when.

What Is Not Yet Known

No construction timetable for the 8,000 kilometres has been published. Nor has a financing plan for that amount been set out.

The government has also not named the six unconnected provinces publicly. That detail would let businesses plan around the gap.

What to Watch

Any announcement of a second international route, toward Libya or the Central African Republic. That is the change that would most reduce Chad’s exposure.

Watch also for disbursement under the World Bank project. Approval in 2024 and construction are different things.

Frequently Asked Questions

How much fibre does Chad need?

About 8,000 kilometres more for full territorial coverage, according to its telecoms minister.

How many provinces are unconnected?

Six.

How many Chadians use the internet?

About 13 percent. Roughly 87 percent were not using it as of 2024.

How does Chad connect to the global internet?

Through a single operational route via Cameroon.

Why is the eastern route down?

It became inoperative because of the conflict in Sudan.

What funding exists?

A World Bank project of about US$122 million approved in September 2024, and a separate programme valued at about 175 million euros.

Sources: Statements by Chad’s telecoms and digital economy minister Haliki Choua Mahamat, 15 September 2026, as reported by Ecofin Agency; World Bank project documents; International Telecommunication Union data for 2024.


The Big Picture

Africa: The New Scramble — why the world’s powers are competing for the continent

This article was produced by The Rio Times’ automated newsroom system. How we use AI · Report an error

LatAm Markets: Live Signals → — real-time movers, turnover leaders and FX across Latin America.

Read More from The Rio Times

The Rio Times · Power Map
See who really holds power in Latin America
Click to open the Power Map

Rotate for Best Experience

This report is optimized for landscape viewing. Rotate your phone for the full experience.