IBOV 204,011.93 ▼ 0.05% IPSA 10,717.79 ▼ 0.58% IPC MEX 69,889.73 ▼ 0.51% MERVAL 3,017,221 — — COLCAP 2,541.57 ▲ 0.52% BVL PERÚ 57,021.19 ▼ 0.08% USD/BRL4.98▼ 1.31% USD/MXN18.65▼ 0.33% USD/CLP994.76▲ 0.87% USD/COP3,145▼ 1.63% USD/PEN3.45▲ 0.29% USD/ARS1,529▲ 0.10% USD/UYU40.08▲ 2.99% USD/PYG5,760▲ 3.42% USD/BOB11.78▲ 3.59% USD/DOP61.09▲ 2.49% USD/CRC452.44▲ 2.51% USD/GTQ7.64▲ 3.15% USD/HNL26.87▲ 3.24% USD/NIO36.62▲ 2.68% USD/VES884.01▼ 0.13% USD/PAB1.00— 0.00% USD/BZD2.00— 0.00% USD/JMD 157.28 — 0.00% USD/TTD6.72▲ 2.14% EUR/BRL5.57▼ 1.19% BRENT 88.88 ▼ 0.03% WTI 83.11 ▼ 0.11% IRON ORE 161.91 — — COPPER 6.61 ▲ 0.03% GOLD 4,461 ▲ 1.78% SILVER 65.59 ▲ 1.26% SOY 1,184 ▲ 3.20% CORN 480.50 ▲ 10.02% WHEAT 655.00 ▲ 3.93% COFFEE 317.25 ▼ 5.51% SUGAR 16.43 ▼ 1.79% ORANGE JUICE 138.55 ▼ 0.47% COTTON 85.03 ▲ 2.33% COCOA 5,719 ▲ 3.18% BEEF 223.60 ▼ 3.93% CATTLE 339.10 ▼ 3.16% LITHIUM 75.20 ▲ 1.47% PETR4 41.64 ▼ 0.05% VALE3 72.97 ▲ 0.83% ITUB4 38.60 ▼ 1.03% BBDC4 16.85 ▲ 0.36% ABEV3 14.89 ▼ 0.80% BBAS3 19.37 ▲ 0.47% B3SA3 14.26 ▼ 0.21% WEGE3 47.59 ▲ 0.49% PRIO3 59.14 ▼ 0.19% SUZB3 41.33 ▲ 2.35% RENT3 34.68 ▼ 0.09% AZZA3 15.89 ▼ 2.63% CSAN3 3.22 ▼ 1.83% RAIZ4 0.25 — 0.00% PCAR3 2.75 ▼ 0.36% GMAT3 3.65 ▼ 1.08% PSSA3 48.13 ▼ 0.54% CVCB3 1.33 ▼ 2.92% POSI3 3.36 ▲ 2.44% SLCE3 13.34 ▲ 0.30% NATU3 8.14 ▼ 0.73% IBOV 204,011.93 ▼ 0.05% IPSA 10,717.79 ▼ 0.58% IPC MEX 69,889.73 ▼ 0.51% MERVAL 3,017,221 — — COLCAP 2,541.57 ▲ 0.52% BVL PERÚ 57,021.19 ▼ 0.08% USD/BRL 5.16 ▲ 0.01% USD/MXN 17.06 ▼ 0.24% USD/CLP 913.98 ▲ 0.04% USD/COP 3,140 ▲ 0.03% USD/PEN 3.36 ▼ 0.66% USD/ARS 1,493 ▲ 0.10% USD/UYU 40.27 ▲ 1.24% USD/PYG 5,939 ▲ 1.68% USD/BOB 11.64 ▼ 0.76% USD/DOP 58.34 ▲ 1.25% USD/CRC 445.92 ▲ 0.89% USD/GTQ 7.62 ▲ 2.21% USD/HNL 26.79 ▲ 1.57% USD/NIO 36.62 ▲ 0.69% USD/VES 762.44 ▼ 0.13% USD/PAB 1.00 — 0.00% USD/BZD 2.00 — 0.00% USD/JMD 157.28 — 0.00% USD/TTD 6.70 ▲ 0.61% EUR/BRL 5.95 ▲ 1.01% BRENT 88.88 ▼ 0.03% WTI 83.11 ▼ 0.11% IRON ORE 161.91 — — COPPER 6.61 ▲ 0.03% GOLD 4,461 ▲ 1.78% SILVER 65.59 ▲ 1.26% SOY 1,184 ▲ 3.20% CORN 480.50 ▲ 10.02% WHEAT 655.00 ▲ 3.93% COFFEE 317.25 ▼ 5.51% SUGAR 16.43 ▼ 1.79% ORANGE JUICE 138.55 ▼ 0.47% COTTON 85.03 ▲ 2.33% COCOA 5,719 ▲ 3.18% BEEF 223.60 ▼ 3.93% CATTLE 339.10 ▼ 3.16% LITHIUM 75.20 ▲ 1.47% PETR4 41.64 ▼ 0.05% VALE3 72.97 ▲ 0.83% ITUB4 38.60 ▼ 1.03% BBDC4 16.85 ▲ 0.36% ABEV3 14.89 ▼ 0.80% BBAS3 19.37 ▲ 0.47% B3SA3 14.26 ▼ 0.21% WEGE3 47.59 ▲ 0.49% PRIO3 59.14 ▼ 0.19% SUZB3 41.33 ▲ 2.35% RENT3 34.68 ▼ 0.09% AZZA3 15.89 ▼ 2.63% CSAN3 3.22 ▼ 1.83% RAIZ4 0.25 — 0.00% PCAR3 2.75 ▼ 0.36% GMAT3 3.65 ▼ 1.08% PSSA3 48.13 ▼ 0.54% CVCB3 1.33 ▼ 2.92% POSI3 3.36 ▲ 2.44% SLCE3 13.34 ▲ 0.30% NATU3 8.14 ▼ 0.73%
since 2009
Friday, October 23, 2026

Business Latin America

Grupo México Plans Up to US$6B at Asarco

By · October 23, 2026 · 7 min read
The Ray open-pit copper mine near Hayden, Arizona, at dusk
The Ray open-pit copper mine in Arizona at dusk (Photo: kallahar, CC BY 3.0, via Wikimedia Commons)

MEXICO · COPPER

Key Facts

  • —The country Mexico is home to Grupo México, a mining and railway group that holds 88.9% of New York-listed Southern Copper and controls the US copper firm Asarco.
  • —Why it matters The United States relied on imports for an estimated 57% of its copper in 2025 and has two primary smelters, so a restart at Hayden in Arizona would add scarce capacity.
  • —Why now A senior executive of the group laid out the spending plan to analysts on Thursday 22 October 2026, two days after its third-quarter results.
  • —What happened Grupo México plans to spend between US$4 billion and US$6 billion over three years on the main projects of Asarco, its US subsidiary.
  • —The numbers Third-quarter copper output fell 1.9% to 260,322 tonnes. A Hayden restart would mean almost 350,000 tonnes of contained copper, or about 500,000 tonnes with the group’s refinery.
  • —What it means for you Buyers of US copper and investors in New York-listed Southern Copper get an early look at possible new US supply, though no date has been set.
  • —Still open How the money splits between the Ray mine, the Silver Bell mine and the Hayden smelter, and when any project is approved or starts.
  • —Power Index Mexico ranks 2nd of 14 in The Rio Times Latin America Power Index, with 71.4 points (October 2026 edition).

Grupo México plans to spend between US$4 billion and US$6 billion over the next three years on the main projects of its US unit Asarco, a senior executive told analysts on Thursday 22 October 2026. Leonardo Contreras, head of the group’s mining division, spoke two days after the Mexican miner published third-quarter results showing lower copper output.

For US readers the plan matters because the United States still imports much of its copper and has few smelters to process it. The US Geological Survey puts net import reliance at an estimated 57% of apparent consumption in 2025 and counts two primary smelters.

Asarco is a copper miner and processor controlled by Grupo México, and its projects named on the call are all in Arizona. The group’s shares closed Thursday down 4.34% on the Mexican exchange, and Forbes México linked the fall to weaker copper prices.

What Grupo México Plans for Asarco

Contreras said the US$4 billion to US$6 billion would go to Asarco’s main projects over three years, according to El Economista and La Jornada, which carried wire reports of the call. Neither report gives a split by project, a year-by-year schedule or a board approval date.

At the Ray mine in Arizona, Contreras said the company is keeping its expansion plan while it runs feasibility studies. The Silver Bell mine, also in Arizona, remains at the feasibility stage, and the company expects more clarity in coming quarters.

Contreras said the group is “increasingly optimistic” about restarting the Hayden smelter and refinery in Arizona. The complex can process 1.4 million tonnes of copper concentrate a year, according to the reports of the call.

A Hayden restart would mean almost 350,000 tonnes of contained copper, Contreras said, and about 500,000 tonnes if the material went to the group’s refinery. None of the reports reviewed gives a restart date.

The tall chimney of the Hayden copper smelter in Hayden, Arizona
The chimney of the Hayden copper smelter in Arizona, photographed in 2019. (Photo: Marine 69-71, CC BY-SA 4.0, via Wikimedia Commons)
RT
Ask Rio Times
Latin American markets, currencies and companies.
Open the full Ask Rio Times →

Why Copper Output Fell in the Third Quarter

Grupo México’s copper output fell 1.9% to 260,322 tonnes in the third quarter, on lower volumes in Peru and at Asarco, partly offset by higher activity in Mexico. The group published its quarterly report on Tuesday 20 October 2026.

Southern Copper, the New York-listed unit of the group, filed its own results with the US Securities and Exchange Commission the same day. The filing puts its copper output at 232,396 tonnes, with a 6.1% drop in Peru that it attributes to lower ore grades.

The Ve por Más analyst note on the quarter also links the group’s 1.9% fall to lower ore grades. It calls the overall results better than the consensus expected.

The same note puts quarterly sales at US$6.33 billion, up 37.9% from a year earlier, and cash and investments at US$13.79 billion. The plan would equal between 29% and 44% of that cash, our arithmetic, though the company has not said how it will fund the projects.

Live Company IntelligenceGrupo México S.A.B. de C.V — the full investor dossierInside: live share price, market cap, three-year financials, valuation, ESG and peer benchmarks — plus the latest Rio Times coverage.
G
◆ Live Company Intelligence
Grupo México
MX: GMEXICOBGMEXICOBasic MaterialsOther Industrial Metals & Mining31,816 employees
MX$1.81T
Market cap

Valuation & profitability

Market capMX$1.81T
Revenue (TTM)MX$22.77B
P / E ratio15.2
Profit margin31.8%
Return on equity28.4%

Price & risk

52-wk low
$135.48
52-wk high
$248.59
Beta (volatility)1.05
200-day average$208.04

Revenue trend · 6y

20202025
Latest MX$18.18B

Ownership

Institutions18.6%
Shares outstanding7.83B

Dividend

Yield0.1%
Payout ratio3.2%
Fwd. annual$3.20
What Grupo México does. Grupo México, S.A.B. de C.V. produces copper worldwide. It operates through Mining, Transportation, and Infrastructure divisions. The Mining division is involved in the operation of underground and open pit mines, smelters, refineries, and other plants. This division also provides copper, silver, molybdenum, zinc, sulfuric acid, gold, and selenium products. The Transportation division…
Data: RT fundamentals (GMEXICOB.MX) · figures in MXN · as of 23 Oct 2026More company intelligence →

How Grupo México Plans Fit US Copper Policy

Copper joined the US Final 2025 List of Critical Minerals, published in the Federal Register on 7 November 2025, according to the Geological Survey. Forbes México adds that Washington has prioritised domestic copper production and secure supply chains for such minerals.

The Geological Survey calls Arizona the leading copper-producing state, with about 70% of US mine output in 2025. Ray and Silver Bell are mines in that state, and Hayden is a smelter in the same state.

The Survey also says US refined copper output fell an estimated 9% in 2025 because both primary smelters had planned maintenance. Primary refinery output from ore was an estimated 790,000 tonnes against refined copper consumption of 1.7 million tonnes.

The January Plan for Hayden

In January 2026 Asarco was moving ahead with plans to reopen and renovate the idle Hayden smelter and the Amarillo refinery in Texas, La Jornada reported on 28 January. Contreras put the overhaul at about US$230 million, and the report says it would lift smelting capacity to 600,000 tonnes of concentrate a year.

The October reports give Hayden’s capacity as 1.4 million tonnes of concentrate and do not mention the US$230 million or Amarillo. The sources reviewed do not reconcile the two sets of figures, so we report both as stated.

What It Means for You

A restart at Hayden would add US smelting capacity, which matters to manufacturers and builders that buy refined copper. No date has been given, so nothing changes for buyers yet.

Investors can follow the group through the Mexican-listed parent and through Southern Copper, which trades in New York under the symbol SCCO. Our Company Intelligence profile on Grupo México and our guide Copper in Latin America 2026: Mines, Prices and Politics cover the mines and the metal’s politics.

Our earlier report Grupo México Profit Jumps 63% to US$1.97B covers the quarterly results, and Southern Copper Plans US$471 Million in Peru covers its Peruvian spending. For the wider picture, see Mexico Natural Resources Explained 2026 and Who Runs Mexico’s Economy, the Key Players in 2026.

What Is Not Known

The company has not said how the US$4 billion to US$6 billion divides between Ray, Silver Bell and Hayden, or whether its board has approved the sums. Redimin, a Chilean mining magazine, describes them as investments under evaluation rather than money already spent.

We could not open Grupo México’s own quarterly report or a transcript of the call, because the company website blocked our requests. The quotes come from wire reports carried by El Economista, La Jornada and Forbes México, which agree on the figures they share.

It is also unknown when Hayden could restart, which permits it needs and how many jobs it would create. The reports reviewed give no timetable for any of the three projects.

What Comes Next

The company expects more clarity on Silver Bell in coming quarters, according to the reports of the call. Investors will watch whether the group attaches a date and a budget to Hayden.

The next quarterly reports will show whether Asarco’s output recovers and how much of the plan has been committed. Copper prices and the US policy debate over critical minerals will shape how fast the group moves.

Frequently Asked Questions

How much will Grupo México spend on Asarco?

The group plans to spend between US$4 billion and US$6 billion over the next three years on Asarco’s main projects. An executive gave the range to analysts on Thursday 22 October 2026.

Which projects does the plan cover?

The projects named are an expansion of the Ray mine, the Silver Bell mine and a restart of the Hayden smelter and refinery, all in Arizona. Ray and Silver Bell are still in feasibility studies.

What would a Hayden restart add?

Contreras said it would mean almost 350,000 tonnes of contained copper, or about 500,000 tonnes with the group’s refinery. The complex can process 1.4 million tonnes of concentrate a year.

Why did Grupo México copper output fall?

Third-quarter output fell 1.9% to 260,322 tonnes on lower volumes in Peru and at Asarco, partly offset by Mexico. Southern Copper blames its Peruvian drop on lower ore grades.

What does it mean for US readers?

It points to possible new US copper smelting capacity at a time when the United States imports an estimated 57% of its copper. No start date or final approval has been announced.

Sources: El Economista, 22 October 2026; La Jornada, 22 October 2026; Forbes México, 23 October 2026; ABC Color, 22 October 2026; Redimin, 23 October 2026; Southern Copper results, SEC filing, 20 October 2026; Ve por Más, Grupo México 3T26 note, 20 October 2026; US Geological Survey, Mineral Commodity Summaries 2026, copper; La Jornada, 28 January 2026.

This article was produced by The Rio Times’ automated newsroom system. How we use AI · Report an error · Editorial responsibility: Matthias Camenzind, Editor-in-Chief

Rotate for Best Experience

This report is optimized for landscape viewing. Rotate your phone for the full experience.