IBOV 164,796.05 ▼ 0.95% COLCAP 2,452.46 — — IPC MEX 69,355.62 ▲ 1.06% MERVAL 2,848,945 — — USD/BRL5.93▼ 0.02% USD/MXN19.19▲ 0.05% USD/CLP1,017▼ 0.59% USD/COP3,515▲ 6.21% USD/PEN3.47▲ 0.26% USD/ARS1,580▼ 0.03% USD/UYU40.61▲ 3.28% USD/PYG6,212▲ 1.77% USD/BOB 11.64 — 0.00% USD/DOP59.54▲ 2.04% USD/CRC441.73▲ 2.16% USD/GTQ7.64▲ 3.41% USD/HNL26.89▲ 3.51% USD/NIO36.62▲ 2.97% USD/VES913.46▼ 0.57% USD/PAB1.00— 0.00% USD/BZD2.00— 0.00% USD/JMD157.69▲ 3.00% USD/TTD6.70▲ 2.17% EUR/BRL6.47▼ 0.85% BRENT 86.62 ▼ 3.08% WTI 80.09 ▼ 0.10% IRON ORE 161.91 — — COPPER 5.53 ▼ 1.78% GOLD 3,622 ▼ 0.81% SILVER 42.23 ▼ 2.14% SOY 1,236 ▲ 0.61% CORN 450.75 ▲ 3.80% WHEAT 595.00 ▲ 3.12% COFFEE 267.35 ▼ 2.73% SUGAR 17.58 ▲ 3.23% ORANGE JUICE 135.40 ▲ 6.11% COTTON 81.21 ▲ 7.61% COCOA 5,281 ▲ 3.04% BEEF 228.78 ▲ 2.59% CATTLE 334.25 ▼ 0.35% LITHIUM 54.70 ▲ 5.23% PETR4 41.30 ▼ 3.21% VALE3 58.41 ▼ 0.12% ITUB4 39.73 ▼ 0.85% BBDC4 13.71 ▼ 0.87% ABEV3 15.94 ▼ 0.87% BBAS3 14.20 ▼ 0.70% B3SA3 14.16 ▼ 0.84% WEGE3 49.91 ▼ 2.39% PRIO3 58.22 ▼ 3.29% SUZB3 55.19 ▼ 0.24% RENT3 28.74 ▼ 0.42% AZZA3 14.58 ▼ 0.34% CSAN3 3.14 ▲ 1.95% RAIZ4 15.00 ▼ 10.71% PCAR3 3.60 ▲ 11.46% GMAT3 4.11 ▼ 1.67% PSSA3 42.91 ▼ 2.39% CVCB3 0.72 — 0.00% POSI3 3.38 ▲ 0.30% SLCE3 16.94 ▼ 3.37% NATU3 4.55 ▲ 1.56% BRKM5 2.91 ▲ 11.92% RANI3 7.81 ▼ 2.50% IBOV 164,796.05 ▼ 0.95% COLCAP 2,452.46 — — IPC MEX 69,355.62 ▲ 1.06% MERVAL 2,848,945 — — USD/BRL 5.93 ▼ 0.02% USD/MXN 19.22 ▲ 0.22% USD/CLP 1,017 ▼ 0.59% USD/COP 3,515 ▲ 6.21% USD/PEN 3.47 ▲ 0.26% USD/ARS 1,580 ▼ 0.03% USD/UYU 40.61 ▲ 3.28% USD/PYG 6,212 ▲ 1.77% USD/BOB 11.64 — 0.00% USD/DOP 59.54 ▲ 2.04% USD/CRC 441.73 ▲ 2.16% USD/GTQ 7.64 ▲ 3.41% USD/HNL 26.89 ▲ 3.51% USD/NIO 36.62 ▲ 2.97% USD/VES 913.46 ▼ 0.57% USD/PAB 1.00 — 0.00% USD/BZD 2.00 — 0.00% USD/JMD 157.69 ▲ 3.00% USD/TTD 6.70 ▲ 2.17% EUR/BRL 6.47 ▼ 0.84% BRENT 86.62 ▼ 3.08% WTI 80.09 ▼ 0.10% IRON ORE 161.91 — — COPPER 5.53 ▼ 1.78% GOLD 3,622 ▼ 0.81% SILVER 42.23 ▼ 2.14% SOY 1,236 ▲ 0.61% CORN 450.75 ▲ 3.80% WHEAT 595.00 ▲ 3.12% COFFEE 267.35 ▼ 2.73% SUGAR 17.58 ▲ 3.23% ORANGE JUICE 135.40 ▲ 6.11% COTTON 81.21 ▲ 7.61% COCOA 5,281 ▲ 3.04% BEEF 228.78 ▲ 2.59% CATTLE 334.25 ▼ 0.35% LITHIUM 54.70 ▲ 5.23% PETR4 41.30 ▼ 3.21% VALE3 58.41 ▼ 0.12% ITUB4 39.73 ▼ 0.85% BBDC4 13.71 ▼ 0.87% ABEV3 15.94 ▼ 0.87% BBAS3 14.20 ▼ 0.70% B3SA3 14.16 ▼ 0.84% WEGE3 49.91 ▼ 2.39% PRIO3 58.22 ▼ 3.29% SUZB3 55.19 ▼ 0.24% RENT3 28.74 ▼ 0.42% AZZA3 14.58 ▼ 0.34% CSAN3 3.14 ▲ 1.95% RAIZ4 15.00 ▼ 10.71% PCAR3 3.60 ▲ 11.46% GMAT3 4.11 ▼ 1.67% PSSA3 42.91 ▼ 2.39% CVCB3 0.72 — 0.00% POSI3 3.38 ▲ 0.30% SLCE3 16.94 ▼ 3.37% NATU3 4.55 ▲ 1.56% BRKM5 2.91 ▲ 11.92% RANI3 7.81 ▼ 2.50%
since 2009
Tuesday, November 24, 2026

Life & Society Real Estate

Rio’s Olympic Village Apartments Expected to Hit Market in June

By · · 3 min read

By Nelson Belen, Contributing Reporter

RIO DE JANEIRO, BRAZIL – On Monday, March 20th, Carvalho Hosken, the construction company behind the Olympic Village in Barra da Tijuca, revealed that the athletes’ residences at the huge complex are currently undergoing a renovation with the hopes that the units can hit the market in June of this year.

The LatAm Brief

One email, every weekday morning. What moved in Latin American markets, politics and expat life.

Yesterday’s subject line: “Chile and Argentina pesos hit one-year lows”

Brazil, Brazil News, Rio de Janeiro
The 3,604 apartments of the Rio 2016 Olympic Village are expected to hit the market in June, according the Carvalho Hosken, photo by Gabriel Heusi/Brasil2016. photo by Gabriel Heusi/brasil2016.gov.br.

The Rio 2016 Olympic Village, the largest athletes’ residence in Olympic history, is a seven-condominium complex comprised of 31 buildings up to seventeen stories tall with a total of 3,604 apartments. The site, used by both the Rio 2016 Olympic and Paralympic athletes, was built by Carvalho Hosken in partnership with embattled construction company, Odebrecht.

According to Henrique Caban, Chief Marketing Officer for Carvalho Hosken, the renovations currently being done are not extensive as the Paralympic athletes used only twenty of the 31 Olympic Village buildings, and in those buildings, they only occupied up to the 12th floor.

“The renovation is to complete things that were not done,” Caban told a government news agency. “The bathrooms, for example, that had been adapted for wheelchair athletes, are being redone.” He added, “The properties will have to go through a second painting and have a scheduled delivery of June.”

Caban warned, however, that with the economic crisis currently afflicting the country, especially in the real estate sector, the work is proceeding slowly.

“Our agenda is in the market,” said Caban. “The market is stationary; offering thirty to forty percent rebates and still nothing sells.” He added, “It’s no good running around because you’re just going to have to spend money.”

Regarding earlier reports that negotiations were underway to sell units to the Brazilian Navy, Caban would only confirm that the company was speaking with several entities about purchasing Olympic Village apartments.

He also indicated that the sales plan includes special financing from government-owned financial institution, Caixa Econômica Federal (CEF). CEF funded the Olympic Village project with a loan of R$2.4 billion. And according to Caban, the construction contract states that CEF must provide financing to prospective owners.

Brazil,The Olympic Village is already receiving athletes from all over the world for the Games,
During the Rio 2016 Paralympics, Paralympic athletes only used twenty of the 31 buildings, Tomaz Silva/Agência Brasil.

Asked by a government news agency, a CEF official would not reveal the terms of any special financing as it is considered “a market operation and the information is protected by bank secrecy.”

The CEF official did clarify that the Olympic Village is going through a renovation that is “transforming the site from the Olympic-style to a style better suited for delivery to purchasers.”

Admiral Flávio Augusto Rocha, Director of the Navy’s Center for Social Communication, confirmed that the Navy had been negotiating with several construction companies, “including Carvalho Hosken, regarding real estate, with the hopes of facilitating the acquisition of housing by members of the Naval forces.”

For his part, Rio de Janeiro mayor, Marcelo Crivella, denied that City Hall would be negotiating the purchase of Olympic Village apartments for city employees. “There is no such project,” said a spokesperson from the Mayor’s Office.

When the Olympic Village apartments do hit the market, they are expected to fetch up to R$8,000 per square meter for the larger three to four bedroom units. The size of the units themselves ranges from seventy to 170 square meters.

Construction of the Olympic Village began in 2013 on a stretch of approximately 800,000 square meters of land in Barra da Tijuca, called Ilha Pura (Pure Island). The site was considered ideal for the Rio 2016 athletes’ village, being accessible to most of the major competition hubs, including the biggest Olympic site, Olympic Park.

Living in or visiting Rio de Janeiro? See this month's events and our Rio de Janeiro city guide with rents, safety and upcoming concerts.

This article was produced by The Rio Times’ automated AI newsroom. Editorial responsibility: Matthias Camenzind, Publisher and Editor-in-Chief. The Rio Times also runs Ask Rio Times, which answers from 100,000+ of our own articles, the daily Latin America Power Map, and prediction-market odds on elections and markets.. How we use AI · Report an error

RT
Ask Rio Times
Latin American markets, currencies and companies.
Open the full Ask Rio Times →
The Rio Times · Power Map
See who really holds power in Latin America
Click to open the Power Map →

Brazil runoff date: Sunday, October 25, poll closing times and when results start · Brazil runoff polls: Flávio 51%, Lula 49% · Kalshi and Polymarket odds

Rotate for Best Experience

This report is optimized for landscape viewing. Rotate your phone for the full experience.