IBOV 171,031.73 ▲ 1.85% IPSA 11,338.38 ▲ 0.89% IPC MEX 65,223.89 ▲ 1.36% MERVAL 2,913,184 ▲ 1.30% COLCAP 2,459.23 ▲ 0.61% BVL PERÚ 58,698.13 ▲ 2.60% USD/BRL5.14▼ 1.18% USD/MXN16.90▼ 0.36% USD/CLP914.28▼ 0.85% USD/COP3,038▼ 0.43% USD/PEN3.35▼ 0.06% USD/ARS1,499▲ 0.12% USD/UYU40.20▲ 1.58% USD/PYG5,996▲ 1.55% USD/BOB11.43▲ 0.41% USD/DOP58.82▲ 0.20% USD/CRC450.05▲ 3.34% USD/GTQ7.62▲ 2.21% USD/HNL26.81▲ 0.31% USD/NIO36.62▲ 0.61% USD/VES778.00▼ 0.13% USD/PAB1.00— 0.00% USD/BZD2.00— 0.00% USD/JMD 157.28 — 0.00% USD/TTD6.71▲ 0.79% EUR/BRL6.00▼ 0.64% BRENT 88.88 ▼ 0.03% WTI 83.11 ▼ 0.11% IRON ORE 161.91 — — COPPER 6.61 ▲ 0.03% GOLD 4,461 ▲ 1.78% SILVER 65.59 ▲ 1.26% SOY 1,184 ▲ 3.20% CORN 480.50 ▲ 10.02% WHEAT 655.00 ▲ 3.93% COFFEE 317.25 ▼ 5.51% SUGAR 16.43 ▼ 1.79% ORANGE JUICE 138.55 ▼ 0.47% COTTON 85.03 ▲ 2.33% COCOA 5,719 ▲ 3.18% BEEF 223.60 ▼ 3.93% CATTLE 339.10 ▼ 3.16% LITHIUM 75.20 ▲ 1.47% PETR4 41.64 ▼ 0.05% VALE3 72.97 ▲ 0.83% ITUB4 38.60 ▼ 1.03% BBDC4 16.85 ▲ 0.36% ABEV3 14.89 ▼ 0.80% BBAS3 19.37 ▲ 0.47% B3SA3 14.26 ▼ 0.21% WEGE3 47.59 ▲ 0.49% PRIO3 59.14 ▼ 0.19% SUZB3 41.33 ▲ 2.35% RENT3 34.68 ▼ 0.09% AZZA3 15.89 ▼ 2.63% CSAN3 3.22 ▼ 1.83% RAIZ4 0.25 — 0.00% PCAR3 2.75 ▼ 0.36% GMAT3 3.65 ▼ 1.08% PSSA3 48.13 ▼ 0.54% CVCB3 1.33 ▼ 2.92% POSI3 3.36 ▲ 2.44% SLCE3 13.34 ▲ 0.30% NATU3 8.14 ▼ 0.73% IBOV 171,031.73 ▲ 1.85% IPSA 11,338.38 ▲ 0.89% IPC MEX 65,223.89 ▲ 1.36% MERVAL 2,913,184 ▲ 1.30% COLCAP 2,459.23 ▲ 0.61% BVL PERÚ 58,698.13 ▲ 2.60% USD/BRL 5.16 ▲ 0.01% USD/MXN 17.06 ▼ 0.24% USD/CLP 913.98 ▲ 0.04% USD/COP 3,140 ▲ 0.03% USD/PEN 3.36 ▼ 0.66% USD/ARS 1,493 ▲ 0.10% USD/UYU 40.27 ▲ 1.24% USD/PYG 5,939 ▲ 1.68% USD/BOB 11.64 ▼ 0.76% USD/DOP 58.34 ▲ 1.25% USD/CRC 445.92 ▲ 0.89% USD/GTQ 7.62 ▲ 2.21% USD/HNL 26.79 ▲ 1.57% USD/NIO 36.62 ▲ 0.69% USD/VES 762.44 ▼ 0.13% USD/PAB 1.00 — 0.00% USD/BZD 2.00 — 0.00% USD/JMD 157.28 — 0.00% USD/TTD 6.70 ▲ 0.61% EUR/BRL 5.95 ▲ 1.01% BRENT 88.88 ▼ 0.03% WTI 83.11 ▼ 0.11% IRON ORE 161.91 — — COPPER 6.61 ▲ 0.03% GOLD 4,461 ▲ 1.78% SILVER 65.59 ▲ 1.26% SOY 1,184 ▲ 3.20% CORN 480.50 ▲ 10.02% WHEAT 655.00 ▲ 3.93% COFFEE 317.25 ▼ 5.51% SUGAR 16.43 ▼ 1.79% ORANGE JUICE 138.55 ▼ 0.47% COTTON 85.03 ▲ 2.33% COCOA 5,719 ▲ 3.18% BEEF 223.60 ▼ 3.93% CATTLE 339.10 ▼ 3.16% LITHIUM 75.20 ▲ 1.47% PETR4 41.64 ▼ 0.05% VALE3 72.97 ▲ 0.83% ITUB4 38.60 ▼ 1.03% BBDC4 16.85 ▲ 0.36% ABEV3 14.89 ▼ 0.80% BBAS3 19.37 ▲ 0.47% B3SA3 14.26 ▼ 0.21% WEGE3 47.59 ▲ 0.49% PRIO3 59.14 ▼ 0.19% SUZB3 41.33 ▲ 2.35% RENT3 34.68 ▼ 0.09% AZZA3 15.89 ▼ 2.63% CSAN3 3.22 ▼ 1.83% RAIZ4 0.25 — 0.00% PCAR3 2.75 ▼ 0.36% GMAT3 3.65 ▼ 1.08% PSSA3 48.13 ▼ 0.54% CVCB3 1.33 ▼ 2.92% POSI3 3.36 ▲ 2.44% SLCE3 13.34 ▲ 0.30% NATU3 8.14 ▼ 0.73%
since 2009
Saturday, August 22, 2026

Africa Africa & the Great Powers

Tanzania Paid US$2.8 Billion for Its Biggest Dam. Egypt Built It

By · August 22, 2026 · 6 min read

Africa Intelligence

A daily Africa read from a Latin American newsroom. Free.

By subscribing you agree to our privacy policy. We never share your email.

EGYPT · GEOPOLITICS

Key Facts

The plant: The Julius Nyerere scheme on the Rufiji River generates 2,115 megawatts, making it Tanzania’s largest single power project.

Who paid: Tanzania financed it from its own budget at a stated cost of Sh7.452 trillion, about US$2.8 billion.

Who built it: An Egyptian consortium of Arab Contractors and Elsewedy Electric, from June 2019 to completion in March 2025.

Already running: By 31 May 2026 the plant had supplied about 44.9% of the electricity fed into the national grid over the preceding year.

The ceremony: President Samia Suluhu Hassan inaugurated it on Saturday 22 August at the site in Rufiji District, Coast Region.

The message: Egypt’s Prime Minister Mostafa Madbouly attended and said the project refutes claims that Egypt opposes development in Nile Basin countries.

The backdrop: Ethiopia said on 20 August it would build further dams whenever it deemed necessary, a day after Egypt’s foreign minister said Cairo would not allow more dams on the Nile.

Tanzania inaugurated the 2,115-megawatt Julius Nyerere hydropower plant on Saturday, a project it paid for itself and an Egyptian consortium built. Cairo is treating the result as an argument as much as an asset.

Julius Nyerere hydropower plant — the Rufiji River in Tanzania
The Rufiji River, which the Julius Nyerere scheme impounds in Tanzania’s Coast Region. (Photo: Rob, CC BY 2.0, via Wikimedia Commons)
One-stop reference
Company Intelligence
Every listed company in Latin America — financials, ownership and structure for 1,450+ companies across 26 exchanges, in one place.
Browse the directory →
RT
Ask Rio Times
Latin American markets, currencies and companies.
Open the full Ask Rio Times →

What Egypt actually delivered

The scheme sits on the Rufiji River in Rufiji District, Coast Region, inland from Dar es Salaam, and generates 2,115 megawatts across nine turbines. That makes it comfortably the largest generating asset in the country.

It was built by an Egyptian consortium of Arab Contractors and Elsewedy Electric, two firms that have spent the past decade turning Egyptian engineering capacity into an export business. Construction began in June 2019 and was completed in March 2025.

The important point about the money is that it was Tanzanian. The government puts the cost at Sh7.452 trillion, about US$2.8 billion at the shilling’s late-August rate, and financed it from its own budget rather than through a foreign loan.

About 12,000 people worked on the site, of whom 1,700 were Egyptian engineers and technicians, according to the Egyptian government. President Samia Suluhu Hassan led Saturday’s ceremony at the site.

The Nile argument the Julius Nyerere hydropower plant is meant to settle

Egypt’s Prime Minister Mostafa Madbouly flew in for the ceremony on behalf of President Abdel Fattah El-Sisi, and the line he chose was aimed squarely at Addis Ababa. He said the project refutes previous claims that Egypt opposes development in Nile Basin countries, while insisting Cairo will safeguard its rights in the river.

The timing was not accidental. On 20 August, Ethiopia’s water and energy minister Habtamu Itefa said his country would build further dams whenever it judged them necessary.

A day before that, Egyptian Foreign Minister Badr Abdelatty said on television that Cairo would not allow the construction of additional dams on the Nile. The two statements sit about as far apart as two governments can manage while still nominally negotiating.

Talks among Egypt, Ethiopia and Sudan over the Grand Ethiopian Renaissance Dam have been frozen since 2024. The Nile basin is shared by eleven countries, and Egypt has spent years losing the argument that its historic allocation should hold.

Why building somebody else’s dam is a strategy

For most of the past fifteen years Egypt’s Nile diplomacy has been defensive, and it has not worked. Ethiopia built the GERD anyway, and the rest of the basin largely sided with the upstream case.

Building 2.1 gigawatts for an upstream basin state is a different kind of argument. It is harder to accuse a country of blocking African development while its contractors are commissioning the largest power station in Tanzania.

There is a commercial dimension as well. Arab Contractors and Elsewedy Electric are becoming genuine pan-African engineering, procurement and construction players, and their order books are one of the more overlooked Egyptian export stories.

Egyptian contractors as an export industry

Elsewedy Electric began as a cable manufacturer and has spent two decades moving up the value chain into transmission, substations and turnkey power projects. Arab Contractors is one of the oldest construction houses in the Arab world and has worked across Africa since the 1970s.

Between them they now bid for the kind of work that used to go automatically to European, Chinese or Turkish firms. Tanzania is the largest single demonstration of that capability so far.

For Egypt the appeal is straightforward. Engineering exports earn hard currency, build political relationships that outlast any single government, and do not require Cairo to win a legal argument about water rights.

The limitation should be equally clear. A contractor delivers what a client finances, and here the client was Tanzania, which chose the Egyptians and wrote the cheques.

What it means for Tanzania

Saturday was a formal inauguration rather than a switch-on, and the distinction matters. The turbines have been feeding the grid progressively, and by 31 May the plant had supplied about 44.9% of all the electricity delivered to the national network over the preceding year.

Total installed capacity in Tanzania has now reached roughly 4,646 megawatts, of which this single site is 2,115. That is a level of concentration few countries would choose.

The country has spent 2026 courting large energy capital, from the long-delayed liquefied natural gas project to the Tanga corridor. Reliable baseload is the precondition for most of it.

One caution belongs on the record, and it is the usual one with large hydro. The Rufiji is a seasonal river, so a plant supplying nearly half the national grid ties the country’s electricity to the rains.

Frequently Asked Questions

How big is the Julius Nyerere hydropower plant?

It generates 2,115 megawatts, which makes it Tanzania’s largest single power project. It sits on the Rufiji River in Rufiji District, Coast Region.

Who built it and who paid?

An Egyptian consortium of Arab Contractors and Elsewedy Electric built it between June 2019 and March 2025. Tanzania financed it from its own budget at a stated Sh7.452 trillion, about US$2.8 billion.

Why is Egypt highlighting the project?

Prime Minister Mostafa Madbouly said it refutes claims that Egypt opposes development in Nile Basin countries. The statement came days after Ethiopia said it would build more dams as needed.

Are the GERD talks still running?

No. Negotiations among Egypt, Ethiopia and Sudan over the Grand Ethiopian Renaissance Dam have been frozen since 2024.

Connected Coverage

The upstream side of this argument is in our coverage of Ethiopia’s new Blue Nile dams. Tanzania’s wider energy push runs through the US$42 billion liquefied natural gas project it has yet to close.

For the contest over African infrastructure and influence, see Africa: The New Scramble and the Northern Africa hub.

This article was produced by The Rio Times’ automated newsroom system. How we use AI · Report an error

LatAm Markets: Live Signals → — real-time movers, turnover leaders and FX across Latin America.

Read More from The Rio Times

The Rio Times · Power Map
See who really holds power in Latin America
Click to open the Power Map

Rotate for Best Experience

This report is optimized for landscape viewing. Rotate your phone for the full experience.