IBOV 209,066.90 ▲ 1.38% IPSA 11,043.36 ▲ 0.17% IPC MEX 66,048.57 ▲ 1.63% MERVAL 2,828,027 ▼ 0.16% COLCAP 2,531.15 ▲ 0.21% BVL PERÚ 60,956.11 ▼ 0.28% USD/BRL4.99▼ 0.02% USD/MXN18.24▼ 0.90% USD/CLP975.06— 0.00% USD/COP3,194▲ 0.22% USD/PEN3.44▲ 0.19% USD/ARS1,517▼ 0.02% USD/UYU40.18▼ 0.06% USD/PYG5,691▲ 0.26% USD/BOB11.69▼ 0.68% USD/DOP61.12▲ 0.41% USD/CRC449.86▼ 0.21% USD/GTQ7.64— 0.00% USD/HNL26.86— 0.00% USD/NIO36.62— 0.00% USD/VES874.61▼ 0.13% USD/PAB1.00— 0.00% USD/BZD2.00— 0.00% USD/JMD 157.28 — 0.00% USD/TTD6.77▲ 0.25% EUR/BRL5.56▼ 0.26% BRENT 88.88 ▼ 0.03% WTI 83.11 ▼ 0.11% IRON ORE 161.91 — — COPPER 6.61 ▲ 0.03% GOLD 4,461 ▲ 1.78% SILVER 65.59 ▲ 1.26% SOY 1,184 ▲ 3.20% CORN 480.50 ▲ 10.02% WHEAT 655.00 ▲ 3.93% COFFEE 317.25 ▼ 5.51% SUGAR 16.43 ▼ 1.79% ORANGE JUICE 138.55 ▼ 0.47% COTTON 85.03 ▲ 2.33% COCOA 5,719 ▲ 3.18% BEEF 223.60 ▼ 3.93% CATTLE 339.10 ▼ 3.16% LITHIUM 75.20 ▲ 1.47% PETR4 41.64 ▼ 0.05% VALE3 72.97 ▲ 0.83% ITUB4 38.60 ▼ 1.03% BBDC4 16.85 ▲ 0.36% ABEV3 14.89 ▼ 0.80% BBAS3 19.37 ▲ 0.47% B3SA3 14.26 ▼ 0.21% WEGE3 47.59 ▲ 0.49% PRIO3 59.14 ▼ 0.19% SUZB3 41.33 ▲ 2.35% RENT3 34.68 ▼ 0.09% AZZA3 15.89 ▼ 2.63% CSAN3 3.22 ▼ 1.83% RAIZ4 0.25 — 0.00% PCAR3 2.75 ▼ 0.36% GMAT3 3.65 ▼ 1.08% PSSA3 48.13 ▼ 0.54% CVCB3 1.33 ▼ 2.92% POSI3 3.36 ▲ 2.44% SLCE3 13.34 ▲ 0.30% NATU3 8.14 ▼ 0.73% IBOV 209,066.90 ▲ 1.38% IPSA 11,043.36 ▲ 0.17% IPC MEX 66,048.57 ▲ 1.63% MERVAL 2,828,027 ▼ 0.16% COLCAP 2,531.15 ▲ 0.21% BVL PERÚ 60,956.11 ▼ 0.28% USD/BRL 5.16 ▲ 0.01% USD/MXN 17.06 ▼ 0.24% USD/CLP 913.98 ▲ 0.04% USD/COP 3,140 ▲ 0.03% USD/PEN 3.36 ▼ 0.66% USD/ARS 1,493 ▲ 0.10% USD/UYU 40.27 ▲ 1.24% USD/PYG 5,939 ▲ 1.68% USD/BOB 11.64 ▼ 0.76% USD/DOP 58.34 ▲ 1.25% USD/CRC 445.92 ▲ 0.89% USD/GTQ 7.62 ▲ 2.21% USD/HNL 26.79 ▲ 1.57% USD/NIO 36.62 ▲ 0.69% USD/VES 762.44 ▼ 0.13% USD/PAB 1.00 — 0.00% USD/BZD 2.00 — 0.00% USD/JMD 157.28 — 0.00% USD/TTD 6.70 ▲ 0.61% EUR/BRL 5.95 ▲ 1.01% BRENT 88.88 ▼ 0.03% WTI 83.11 ▼ 0.11% IRON ORE 161.91 — — COPPER 6.61 ▲ 0.03% GOLD 4,461 ▲ 1.78% SILVER 65.59 ▲ 1.26% SOY 1,184 ▲ 3.20% CORN 480.50 ▲ 10.02% WHEAT 655.00 ▲ 3.93% COFFEE 317.25 ▼ 5.51% SUGAR 16.43 ▼ 1.79% ORANGE JUICE 138.55 ▼ 0.47% COTTON 85.03 ▲ 2.33% COCOA 5,719 ▲ 3.18% BEEF 223.60 ▼ 3.93% CATTLE 339.10 ▼ 3.16% LITHIUM 75.20 ▲ 1.47% PETR4 41.64 ▼ 0.05% VALE3 72.97 ▲ 0.83% ITUB4 38.60 ▼ 1.03% BBDC4 16.85 ▲ 0.36% ABEV3 14.89 ▼ 0.80% BBAS3 19.37 ▲ 0.47% B3SA3 14.26 ▼ 0.21% WEGE3 47.59 ▲ 0.49% PRIO3 59.14 ▼ 0.19% SUZB3 41.33 ▲ 2.35% RENT3 34.68 ▼ 0.09% AZZA3 15.89 ▼ 2.63% CSAN3 3.22 ▼ 1.83% RAIZ4 0.25 — 0.00% PCAR3 2.75 ▼ 0.36% GMAT3 3.65 ▼ 1.08% PSSA3 48.13 ▼ 0.54% CVCB3 1.33 ▼ 2.92% POSI3 3.36 ▲ 2.44% SLCE3 13.34 ▲ 0.30% NATU3 8.14 ▼ 0.73%
since 2009
Monday, October 12, 2026

Bolivia Business - Brazil

Bolivia to invest over US$465 million on Bioceanic Railway Corridor

By · June 29, 2022 · 2 min read

RIO DE JANEIRO, BRAZIL – The Bolivian Government will invest more than US$465 million until 2025 for the construction of the Bioceanic Integration Railway Corridor, according to the Minister of Public Works, Services and Housing, Édgar Montaño.

“We are going to invest more than BOB 3.2 billion (US$465 million) until 2025,” answered the authority when asked about how much the Bolivian State will invest in building the project.

Along with the above, Montaño explained that the eastern railway network from Montero to Bulo Bulo has already been built in Bolivian territory, and only one section remains to be completed.

"We are going to invest more than BOB 3.2 billion (US$465 million) until 2025," answered the authority when asked about how much the Bolivian State will invest in building the project.
“We are going to invest more than BOB 3.2 billion (US$465 million) until 2025,” answered the authority when asked about how much the Bolivian State will invest in building the project.
RT
Ask Rio Times
Latin American markets, currencies and companies.
Open the full Ask Rio Times →

Likewise, with an investment of US$2.6 million, the study for the construction of the Bulo Bulo – Ivirgazama – Villa Tunari railway has already been tendered this year.

“Obviously, from there, we will also have to tender Villa Tunari to Capinota and Capinota; since Oruro is very close, we already have the western railroad road network. Therefore, we will be missing that section, and that is why I was saying that we will invest more than BOB 3.2 billion in these routes until 2025,” he said.

The LatAm Brief

One email, every weekday morning. What moved in Latin American markets, politics and expat life.

Yesterday’s subject line: “Simon keeps Puerto Vallarta airport shut until Tuesday”

Free. We send a confirmation link first — nothing arrives until you click it. Unsubscribe with one click in any edition. If you stop opening us for 30 days we stop sending by ourselves, as we assume the interest is no longer there. See our privacy policy. We never share your email.

In this context, the minister asked the governor of Santa Cruz, Fernando Camacho, to allocate economic resources for the Bioceanic Integration Railway Corridor, considering that in the past days, he committed investments to a Brazilian authority.

With information from Portal Portuario

This article was produced by The Rio Times’ automated newsroom system. How we use AI · Report an error · Editorial responsibility: Matthias Camenzind, Editor-in-Chief

The Rio Times · Power Map
See who really holds power in Latin America
Click to open the Power Map →

Rotate for Best Experience

This report is optimized for landscape viewing. Rotate your phone for the full experience.