IBOV 164,796.05 ▼ 0.95% COLCAP 2,452.46 — — IPC MEX 69,490.83 ▲ 1.26% MERVAL 2,848,945 — — USD/BRL5.93▼ 0.33% USD/MXN19.17▼ 0.06% USD/CLP1,017▼ 0.59% USD/COP3,505▲ 0.62% USD/PEN3.47▲ 0.26% USD/ARS1,580▼ 0.03% USD/UYU40.61— 0.00% USD/PYG6,212— 0.00% USD/BOB11.64▲ 3.11% USD/DOP59.54▲ 2.04% USD/CRC441.73▲ 2.16% USD/GTQ7.64▲ 3.41% USD/HNL26.89▲ 3.51% USD/NIO36.62▲ 2.97% USD/VES913.46▼ 0.57% USD/PAB1.00— 0.00% USD/BZD2.00— 0.00% USD/JMD157.69▲ 3.00% USD/TTD6.70▲ 2.17% EUR/BRL6.47▼ 0.85% BRENT 86.43 ▼ 3.29% WTI 79.84 ▼ 0.41% IRON ORE 161.91 — — COPPER 5.49 ▼ 2.43% GOLD 3,628 ▼ 0.64% SILVER 42.16 ▼ 2.30% SOY 1,231 ▲ 0.16% CORN 449.50 ▲ 3.51% WHEAT 593.75 ▲ 2.90% COFFEE 267.35 ▼ 2.73% SUGAR 17.58 ▲ 3.23% ORANGE JUICE 135.40 ▲ 6.11% COTTON 81.21 ▲ 7.61% COCOA 5,281 ▲ 3.04% BEEF 228.78 ▲ 2.59% CATTLE 334.25 ▼ 0.35% LITHIUM 54.70 ▲ 5.23% PETR4 41.30 ▼ 3.21% VALE3 58.41 ▼ 0.12% ITUB4 39.73 ▼ 0.85% BBDC4 13.71 ▼ 0.87% ABEV3 15.94 ▼ 0.87% BBAS3 14.20 ▼ 0.70% B3SA3 14.16 ▼ 0.84% WEGE3 49.91 ▼ 2.39% PRIO3 58.22 ▼ 3.29% SUZB3 55.19 ▼ 0.24% RENT3 28.74 ▼ 0.42% AZZA3 14.58 ▼ 0.34% CSAN3 3.14 ▲ 1.95% RAIZ4 15.00 ▼ 10.71% PCAR3 3.60 ▲ 11.46% GMAT3 4.11 ▼ 1.67% PSSA3 42.91 ▼ 2.39% CVCB3 0.72 — 0.00% POSI3 3.38 ▲ 0.30% SLCE3 16.94 ▼ 3.37% NATU3 4.55 ▲ 1.56% BRKM5 2.91 ▲ 11.92% RANI3 7.81 ▼ 2.50% IBOV 164,796.05 ▼ 0.95% COLCAP 2,452.46 — — IPC MEX 69,490.83 ▲ 1.26% MERVAL 2,848,945 — — USD/BRL 5.93 ▼ 0.02% USD/MXN 19.17 ▼ 0.06% USD/CLP 1,017 ▼ 0.59% USD/COP 3,505 ▲ 5.91% USD/PEN 3.47 ▲ 0.27% USD/ARS 1,580 ▼ 0.03% USD/UYU 40.61 ▲ 3.28% USD/PYG 6,212 ▲ 1.77% USD/BOB 11.64 ▲ 3.11% USD/DOP 59.54 ▲ 2.04% USD/CRC 441.73 ▲ 2.16% USD/GTQ 7.64 ▲ 3.41% USD/HNL 26.89 ▲ 3.51% USD/NIO 36.62 ▲ 2.97% USD/VES 913.46 ▼ 0.57% USD/PAB 1.00 — 0.00% USD/BZD 2.00 — 0.00% USD/JMD 157.69 ▲ 3.00% USD/TTD 6.70 ▲ 2.17% EUR/BRL 6.47 ▼ 0.85% BRENT 86.43 ▼ 3.29% WTI 79.84 ▼ 0.41% IRON ORE 161.91 — — COPPER 5.49 ▼ 2.43% GOLD 3,628 ▼ 0.64% SILVER 42.16 ▼ 2.30% SOY 1,231 ▲ 0.16% CORN 449.50 ▲ 3.51% WHEAT 593.75 ▲ 2.90% COFFEE 267.35 ▼ 2.73% SUGAR 17.58 ▲ 3.23% ORANGE JUICE 135.40 ▲ 6.11% COTTON 81.21 ▲ 7.61% COCOA 5,281 ▲ 3.04% BEEF 228.78 ▲ 2.59% CATTLE 334.25 ▼ 0.35% LITHIUM 54.70 ▲ 5.23% PETR4 41.30 ▼ 3.21% VALE3 58.41 ▼ 0.12% ITUB4 39.73 ▼ 0.85% BBDC4 13.71 ▼ 0.87% ABEV3 15.94 ▼ 0.87% BBAS3 14.20 ▼ 0.70% B3SA3 14.16 ▼ 0.84% WEGE3 49.91 ▼ 2.39% PRIO3 58.22 ▼ 3.29% SUZB3 55.19 ▼ 0.24% RENT3 28.74 ▼ 0.42% AZZA3 14.58 ▼ 0.34% CSAN3 3.14 ▲ 1.95% RAIZ4 15.00 ▼ 10.71% PCAR3 3.60 ▲ 11.46% GMAT3 4.11 ▼ 1.67% PSSA3 42.91 ▼ 2.39% CVCB3 0.72 — 0.00% POSI3 3.38 ▲ 0.30% SLCE3 16.94 ▼ 3.37% NATU3 4.55 ▲ 1.56% BRKM5 2.91 ▲ 11.92% RANI3 7.81 ▼ 2.50%
since 2009
Tuesday, November 24, 2026

Latin America Paraguay

Bioceanic route generates hope for development in Alto Paraguay

By · · 3 min read

RIO DE JANEIRO, BRAZIL – Currently, only five kilometers remain to be asphalted, and then the signaling and placement of paving, with which the 277 kilometers of asphalting of the bi-oceanic route will be completed, which in this first stage joins the communities of Carmelo Peralta and Loma Plata.

Until 2019, the Alto Chaco was the only region with no single centimeter of asphalted road. Work on this important project began in January of the same year. Today, of these 277 kilometers, 163 kilometers are in Alto Paraguay.

Key Facts

— Deep Dive

— For the complete picture, read our in-depth guide: Paraguay: Washington's Most Valued Ally in Latin America

With the new bi-oceanic route and the imminent beginning of the works for the bridge that will join Paraguay with Brazil, a whole range of development possibilities opens up for the inhabitants of these distant communities of the Alto Chaco.
With the new bi-oceanic route and the imminent beginning of the works for the bridge that will join Paraguay with Brazil, a whole range of development possibilities opens up for the inhabitants of these distant communities of the Alto Chaco.

Even though other important stretches within the department, such as the roads leading to Fuerte Olimpo and Bahía Negra districts, still need to be asphalted, this first all-weather road layout greatly speeds up travel to the area.

Free daily brief — no card needed
Get every Latin America story in one morning email
We build you a personalized brief around the topics you follow — free for 7 days. Love it? Your first month after that is US$1.

The community of Loma Plata is about 340 kilometers from Fuerte Olimpo. In the past, going to this locality by dirt roads took between eight to ten hours, depending on the state of the stretches, since on rainy days, the situation worsened. With the new bi-oceanic route, about 210 kilometers are traveled on asphalt, and only about 140 kilometers of dirt road remain to reach this destination.

DEVELOPMENT

With the new bi-oceanic route and the imminent beginning of the works for the bridge that will join Paraguay with Brazil, a whole range of development possibilities opens up for the inhabitants of these distant communities of the Alto Chaco.

Precisely, the community of Carmelo Peralta, up to where the asphalt reaches, begins to promote tourist development with the installation of numerous lodgings and some hotels, which will lodge those interested in knowing the beauties of the great marshland. The same situation occurs in Fuerte Olimpo and Bahía Negra, but with less intensity, considering that they still have problems due to the precariousness of their roads, especially on rainy days.

The all-weather road makes it possible to expedite the shipment of cattle to slaughterhouses, which ensures the development of cattle raising in the area, considering that Alto Paraguay, with almost 2 million head of cattle, centralizes its economic potential in this area.

ANECDOTES

With the new route of the bi-oceanic road, there are many anecdotes that people tell of when in the past they were stuck on the side of the road and could not continue their journey due to the precariousness of the road. One of these occurred in 2014, when several passengers of a bus trying to reach Bahía Negra were stuck for almost two weeks, unable to move forward. They finally had to be rescued aboard Air Force helicopters.

COMPLETION

By the end of February, the completion of the 277 kilometers of the first stage of the bi-oceanic route is foreseen, considering that the second stage includes the road from Loma Plata to Pozo Hondo, the border with Argentina. In this way, the initial project that seeks to join the Pacific and Atlantic oceans to speed up trade will be completed.

The bi-oceanic consortium made up of the companies Queiroz Galvao S.A. and Ocho A S.A. was in charge of the construction. Some 1,000 workers worked for 38 months, and the initial cost is US$445 million, corresponding to the loan from the Inter-American Development Bank (IDB).

This article was produced by The Rio Times’ automated AI newsroom. Editorial responsibility: Matthias Camenzind, Publisher and Editor-in-Chief. The Rio Times also runs Ask Rio Times, which answers from 100,000+ of our own articles, the daily Latin America Power Map, and prediction-market odds on elections and markets.. How we use AI · Report an error

RT
Ask Rio Times
This story and the bigger picture.
Open the full Ask Rio Times →
The Rio Times · Power Map
See who really holds power in Latin America
Click to open the Power Map →

Brazil runoff date: Sunday, October 25, poll closing times and when results start · Brazil runoff polls: Flávio 51%, Lula 49% · Kalshi and Polymarket odds

Rotate for Best Experience

This report is optimized for landscape viewing. Rotate your phone for the full experience.