IBOV 173,695.84 ▲ 1.04% IPSA 11,474.31 ▼ 0.55% IPC MEX 65,522.56 ▼ 0.38% MERVAL 2,982,634 ▼ 0.42% COLCAP 2,503.96 ▼ 0.27% BVL PERÚ 60,117.56 ▲ 0.70% USD/BRL5.15▼ 0.12% USD/MXN16.94▼ 0.02% USD/CLP912.99▲ 0.02% USD/COP3,085▲ 1.35% USD/PEN3.35▼ 0.09% USD/ARS1,512▲ 0.13% USD/UYU40.18▲ 1.06% USD/PYG5,968▲ 0.82% USD/BOB11.47▲ 0.68% USD/DOP58.01▲ 0.07% USD/CRC447.25▲ 0.82% USD/GTQ7.62▲ 2.02% USD/HNL26.82▲ 1.52% USD/NIO36.62▲ 0.58% USD/VES783.11▼ 0.13% USD/PAB1.00— 0.00% USD/BZD2.00— 0.00% USD/JMD 157.28 — 0.00% USD/TTD6.73▲ 0.97% EUR/BRL6.01▲ 0.20% BRENT 88.88 ▼ 0.03% WTI 83.11 ▼ 0.11% IRON ORE 161.91 — — COPPER 6.61 ▲ 0.03% GOLD 4,461 ▲ 1.78% SILVER 65.59 ▲ 1.26% SOY 1,184 ▲ 3.20% CORN 480.50 ▲ 10.02% WHEAT 655.00 ▲ 3.93% COFFEE 317.25 ▼ 5.51% SUGAR 16.43 ▼ 1.79% ORANGE JUICE 138.55 ▼ 0.47% COTTON 85.03 ▲ 2.33% COCOA 5,719 ▲ 3.18% BEEF 223.60 ▼ 3.93% CATTLE 339.10 ▼ 3.16% LITHIUM 75.20 ▲ 1.47% PETR4 41.64 ▼ 0.05% VALE3 72.97 ▲ 0.83% ITUB4 38.60 ▼ 1.03% BBDC4 16.85 ▲ 0.36% ABEV3 14.89 ▼ 0.80% BBAS3 19.37 ▲ 0.47% B3SA3 14.26 ▼ 0.21% WEGE3 47.59 ▲ 0.49% PRIO3 59.14 ▼ 0.19% SUZB3 41.33 ▲ 2.35% RENT3 34.68 ▼ 0.09% AZZA3 15.89 ▼ 2.63% CSAN3 3.22 ▼ 1.83% RAIZ4 0.25 — 0.00% PCAR3 2.75 ▼ 0.36% GMAT3 3.65 ▼ 1.08% PSSA3 48.13 ▼ 0.54% CVCB3 1.33 ▼ 2.92% POSI3 3.36 ▲ 2.44% SLCE3 13.34 ▲ 0.30% NATU3 8.14 ▼ 0.73% IBOV 173,695.84 ▲ 1.04% IPSA 11,474.31 ▼ 0.55% IPC MEX 65,522.56 ▼ 0.38% MERVAL 2,982,634 ▼ 0.42% COLCAP 2,503.96 ▼ 0.27% BVL PERÚ 60,117.56 ▲ 0.70% USD/BRL 5.16 ▲ 0.01% USD/MXN 17.06 ▼ 0.24% USD/CLP 913.98 ▲ 0.04% USD/COP 3,140 ▲ 0.03% USD/PEN 3.36 ▼ 0.66% USD/ARS 1,493 ▲ 0.10% USD/UYU 40.27 ▲ 1.24% USD/PYG 5,939 ▲ 1.68% USD/BOB 11.64 ▼ 0.76% USD/DOP 58.34 ▲ 1.25% USD/CRC 445.92 ▲ 0.89% USD/GTQ 7.62 ▲ 2.21% USD/HNL 26.79 ▲ 1.57% USD/NIO 36.62 ▲ 0.69% USD/VES 762.44 ▼ 0.13% USD/PAB 1.00 — 0.00% USD/BZD 2.00 — 0.00% USD/JMD 157.28 — 0.00% USD/TTD 6.70 ▲ 0.61% EUR/BRL 5.95 ▲ 1.01% BRENT 88.88 ▼ 0.03% WTI 83.11 ▼ 0.11% IRON ORE 161.91 — — COPPER 6.61 ▲ 0.03% GOLD 4,461 ▲ 1.78% SILVER 65.59 ▲ 1.26% SOY 1,184 ▲ 3.20% CORN 480.50 ▲ 10.02% WHEAT 655.00 ▲ 3.93% COFFEE 317.25 ▼ 5.51% SUGAR 16.43 ▼ 1.79% ORANGE JUICE 138.55 ▼ 0.47% COTTON 85.03 ▲ 2.33% COCOA 5,719 ▲ 3.18% BEEF 223.60 ▼ 3.93% CATTLE 339.10 ▼ 3.16% LITHIUM 75.20 ▲ 1.47% PETR4 41.64 ▼ 0.05% VALE3 72.97 ▲ 0.83% ITUB4 38.60 ▼ 1.03% BBDC4 16.85 ▲ 0.36% ABEV3 14.89 ▼ 0.80% BBAS3 19.37 ▲ 0.47% B3SA3 14.26 ▼ 0.21% WEGE3 47.59 ▲ 0.49% PRIO3 59.14 ▼ 0.19% SUZB3 41.33 ▲ 2.35% RENT3 34.68 ▼ 0.09% AZZA3 15.89 ▼ 2.63% CSAN3 3.22 ▼ 1.83% RAIZ4 0.25 — 0.00% PCAR3 2.75 ▼ 0.36% GMAT3 3.65 ▼ 1.08% PSSA3 48.13 ▼ 0.54% CVCB3 1.33 ▼ 2.92% POSI3 3.36 ▲ 2.44% SLCE3 13.34 ▲ 0.30% NATU3 8.14 ▼ 0.73%
since 2009
Tuesday, August 25, 2026

Life & Society Politics - Brazil

Line 4 Metro License Approved in Rio: Daily

By · April 15, 2012 · 2 min read

Daily Brief

The morning intel from across Latin America. Free.

By subscribing you agree to our privacy policy. We never share your email.

By Ségolène Poirier, Contributing Reporter

RIO DE JANEIRO, BRAZIL – The environmental license for the construction of the Metro Line 4 was approved on Friday by the directors of the State Environmental Control Commission (CECA), to build four new stations between Ipanema and Gávea. This clears the way for work to begin in the next two months, and should be completed by December 2015.

Four new stations on Metro Line 4, Zona Sul, Rio de Janeiro, Brazil News
Four new stations on Metro Line 4, image by Governo do Rio de Janeiro.
One-stop reference
Company Intelligence
Every listed company in Latin America — financials, ownership and structure for 1,450+ companies across 26 exchanges, in one place.
Browse the directory →
RT
Ask Rio Times
This story and the bigger picture.
Open the full Ask Rio Times →

The lack of an environmental license was one of the obstacles faced by the state, which promised to complete the Metro Line 4 to reach Barra de Tijuca before the 2016 Olympics Games.

This specific license concerns the underground excavations for the extension of the subway line to create four new stations in Zona Sul (South Zone); Nossa Senhora da Paz, Jardim de Alah, Antero de Quental and Gávea.

The State Secretary of Environment, Carlos Minc, said that the license was granted unanimously. “The score was twelve to zero among councilors, […]. It means less exhaust, less noise, less roadkill, less CO2 emissions. We have to have more subways, trains, ferries and bike paths.”

One of the stipulations was the Gávea Station will be built on two levels and will provide a future connection to Carioca station in Centro. This would be along Line 1, and pass through Jardim Botânico, Humaitá, Botafogo and Laranjeiras.

The excavation for the four new Metro stations in Zona Sul will be simultaneous. This will allow the passage of “tatuzão”, a super-size underground drilling machine which is more than a hundred meters long and weighs about 2,000 tons.

The tatuzão use will avoid trenching on the surface and along the streets of the already congested roadways. The Metro tunnel excavations are planned to be made twelve meters under ground, minimizing impacts on the local residents’ lives.

Once complete Line 4 will carry an average of 300,000 passengers per day, according to the state, connecting Barra de Tijuca to Centro in just thirty minutes commute time.

Read more (in Portuguese).

* The Rio Times Daily Update is a new feature we are offering to help keep you up-to-date with major news as it happens.

Read More from The Rio Times

The Rio Times · Power Map
See who really holds power in Latin America
Click to open the Power Map

Rotate for Best Experience

This report is optimized for landscape viewing. Rotate your phone for the full experience.