IBOV 206,505.98 ▼ 0.18% IPSA 10,966.21 ▼ 0.49% IPC MEX 66,965.15 ▲ 0.33% MERVAL 2,835,843 ▼ 1.16% COLCAP 2,582.29 ▲ 0.46% BVL PERÚ 60,511.74 ▼ 1.60% USD/BRL5.03▲ 0.05% USD/MXN18.50▲ 0.70% USD/CLP984.88▲ 0.24% USD/COP3,172▼ 0.72% USD/PEN3.43▼ 0.06% USD/ARS1,513▼ 0.02% USD/UYU40.20▲ 3.11% USD/PYG5,684▲ 3.29% USD/BOB11.65▲ 1.40% USD/DOP61.11▲ 3.74% USD/CRC449.35▲ 1.80% USD/GTQ7.64▲ 3.11% USD/HNL26.86▲ 3.26% USD/NIO36.62▲ 2.71% USD/VES875.71▼ 0.13% USD/PAB1.00— 0.00% USD/BZD2.00— 0.00% USD/JMD 157.28 — 0.00% USD/TTD6.77▲ 2.76% EUR/BRL5.61▲ 0.94% BRENT 88.88 ▼ 0.03% WTI 83.11 ▼ 0.11% IRON ORE 161.91 — — COPPER 6.61 ▲ 0.03% GOLD 4,461 ▲ 1.78% SILVER 65.59 ▲ 1.26% SOY 1,184 ▲ 3.20% CORN 480.50 ▲ 10.02% WHEAT 655.00 ▲ 3.93% COFFEE 317.25 ▼ 5.51% SUGAR 16.43 ▼ 1.79% ORANGE JUICE 138.55 ▼ 0.47% COTTON 85.03 ▲ 2.33% COCOA 5,719 ▲ 3.18% BEEF 223.60 ▼ 3.93% CATTLE 339.10 ▼ 3.16% LITHIUM 75.20 ▲ 1.47% PETR4 41.64 ▼ 0.05% VALE3 72.97 ▲ 0.83% ITUB4 38.60 ▼ 1.03% BBDC4 16.85 ▲ 0.36% ABEV3 14.89 ▼ 0.80% BBAS3 19.37 ▲ 0.47% B3SA3 14.26 ▼ 0.21% WEGE3 47.59 ▲ 0.49% PRIO3 59.14 ▼ 0.19% SUZB3 41.33 ▲ 2.35% RENT3 34.68 ▼ 0.09% AZZA3 15.89 ▼ 2.63% CSAN3 3.22 ▼ 1.83% RAIZ4 0.25 — 0.00% PCAR3 2.75 ▼ 0.36% GMAT3 3.65 ▼ 1.08% PSSA3 48.13 ▼ 0.54% CVCB3 1.33 ▼ 2.92% POSI3 3.36 ▲ 2.44% SLCE3 13.34 ▲ 0.30% NATU3 8.14 ▼ 0.73% IBOV 206,505.98 ▼ 0.18% IPSA 10,966.21 ▼ 0.49% IPC MEX 66,965.15 ▲ 0.33% MERVAL 2,835,843 ▼ 1.16% COLCAP 2,582.29 ▲ 0.46% BVL PERÚ 60,511.74 ▼ 1.60% USD/BRL 5.16 ▲ 0.01% USD/MXN 17.06 ▼ 0.24% USD/CLP 913.98 ▲ 0.04% USD/COP 3,140 ▲ 0.03% USD/PEN 3.36 ▼ 0.66% USD/ARS 1,493 ▲ 0.10% USD/UYU 40.27 ▲ 1.24% USD/PYG 5,939 ▲ 1.68% USD/BOB 11.64 ▼ 0.76% USD/DOP 58.34 ▲ 1.25% USD/CRC 445.92 ▲ 0.89% USD/GTQ 7.62 ▲ 2.21% USD/HNL 26.79 ▲ 1.57% USD/NIO 36.62 ▲ 0.69% USD/VES 762.44 ▼ 0.13% USD/PAB 1.00 — 0.00% USD/BZD 2.00 — 0.00% USD/JMD 157.28 — 0.00% USD/TTD 6.70 ▲ 0.61% EUR/BRL 5.95 ▲ 1.01% BRENT 88.88 ▼ 0.03% WTI 83.11 ▼ 0.11% IRON ORE 161.91 — — COPPER 6.61 ▲ 0.03% GOLD 4,461 ▲ 1.78% SILVER 65.59 ▲ 1.26% SOY 1,184 ▲ 3.20% CORN 480.50 ▲ 10.02% WHEAT 655.00 ▲ 3.93% COFFEE 317.25 ▼ 5.51% SUGAR 16.43 ▼ 1.79% ORANGE JUICE 138.55 ▼ 0.47% COTTON 85.03 ▲ 2.33% COCOA 5,719 ▲ 3.18% BEEF 223.60 ▼ 3.93% CATTLE 339.10 ▼ 3.16% LITHIUM 75.20 ▲ 1.47% PETR4 41.64 ▼ 0.05% VALE3 72.97 ▲ 0.83% ITUB4 38.60 ▼ 1.03% BBDC4 16.85 ▲ 0.36% ABEV3 14.89 ▼ 0.80% BBAS3 19.37 ▲ 0.47% B3SA3 14.26 ▼ 0.21% WEGE3 47.59 ▲ 0.49% PRIO3 59.14 ▼ 0.19% SUZB3 41.33 ▲ 2.35% RENT3 34.68 ▼ 0.09% AZZA3 15.89 ▼ 2.63% CSAN3 3.22 ▼ 1.83% RAIZ4 0.25 — 0.00% PCAR3 2.75 ▼ 0.36% GMAT3 3.65 ▼ 1.08% PSSA3 48.13 ▼ 0.54% CVCB3 1.33 ▼ 2.92% POSI3 3.36 ▲ 2.44% SLCE3 13.34 ▲ 0.30% NATU3 8.14 ▼ 0.73%
since 2009
Wednesday, October 14, 2026

Africa Business

Elsewedy Electric Signs US$2.2bn Saudi Deal

By · October 14, 2026 · 6 min read
Steam power station in Assiut, Upper Egypt, lit up at night
A steam power station in Assiut, Egypt, pictured in 2023. (Photo: Mohsen9991, CC BY-SA 4.0, via Wikimedia Commons)

COMPANIES · EGYPT

Key Facts

  • —The country Egypt is the Arab world’s most populous country and home to Elsewedy Electric, a cable and power engineering group listed in Cairo.
  • —Why it matters A US$2.2 billion contract is a large foreign win for an Egyptian contractor while the pound is weak and export earnings are prized.
  • —Why now The joint venture signed the full construction contract this week, moving the Saudi project from early works into full-scale execution.
  • —What happened An Elsewedy unit and China’s Sinohydro signed a contract worth about US$2.2 billion for Saudi Arabia’s Rabigh 2 power expansion, announced on Tuesday 13 October.
  • —The numbers The gas-fired plant adds 2.3 gigawatts, is already more than 39% complete and is due to start commercial operation in May 2029.
  • —What it means for you US holders of Egyptian shares or frontier funds may see the deal lift the group’s order book, but its share of the value is undisclosed.
  • —Still open How the US$2.2 billion splits between the two partners, and the margins, financing and payment terms.

Elsewedy Electric, the Cairo-listed cable and power engineering group, is part of a venture that signed a contract worth about US$2.2 billion in Saudi Arabia. The deal, announced on Tuesday 13 October, will expand a gas power plant in Rabigh on the Red Sea coast.

For foreign investors, it shows an Egyptian company winning large infrastructure work in Saudi Arabia, a close US partner in the Gulf. It also arrives as Egypt’s currency weakens, which makes foreign earnings more valuable to the economy.

The group’s power projects arm, Elsewedy Electric PSP, will build the 2.3-gigawatt Rabigh 2 expansion with Sinohydro of China. Commercial operation is targeted for May 2029, according to the joint venture’s announcement.

What the Rabigh 2 Contract Covers

The engineering, procurement and construction contract was awarded by Al Mourjan Two for Electricity Company, the project company behind the expansion. TradeArabia, in a report republished by Zawya, said the company was set up by Acwa Power and Saudi Energy.

Acwa Power is a developer of power and water plants listed on the Saudi stock exchange under the code 2082. Its chief executive, Samir J Serhan, called the expansion “an important addition to Saudi Arabia’s power system”.

The scope is turnkey and covers design, engineering, procurement, construction, commissioning, performance testing, civil works and the link to the grid. The plant will use six Siemens SGT6-5000F gas turbines, two Siemens SST-5000 steam turbines and six heat recovery steam generators.

Work is not starting from zero, because it began under an earlier limited notice to proceed. Overall progress already exceeds 39%, and the partners report more than five million safe man-hours on site.

Hesham Hegazy, chief executive of the PSP unit, called the signing “a proud moment for our joint venture”. Peng Gang, president of PowerChina MENA, said Sinohydro was proud to bring its global construction experience to the partnership.

Sinohydro is a subsidiary of Power Construction Corporation of China, a state-owned builder known as POWERCHINA. The two partners have not said how the work and the money will be divided between them.

Cairo skyline seen across the Nile with green riverbanks in the foreground
The Cairo skyline seen across the Nile, pictured in 2007. (Photo: Vyacheslav Argenberg, CC BY 4.0, via Wikimedia Commons)
RT
Ask Rio Times
Latin American markets, currencies and companies.
Open the full Ask Rio Times →

Why the Deal Matters for Elsewedy Electric

The group traces its roots to 1938, when the Elsewedy family started a small electrical equipment business in Cairo, according to its website. It trades on the Egyptian Exchange under the code SWDY.CA, the joint venture’s release states.

Saudi Arabia is familiar ground for the Egyptian contractor. In September 2024, an Elsewedy official told Al Arabiya that the company was building a US$800 million power plant in Rabigh with Siemens.

A contract of this size can fill an order book for years, which gives investors more visibility on future revenue. The risk is that large fixed-price power projects can suffer cost overruns, supply delays and penalty payments.

For Egypt, foreign contracts like this one bring in earnings from abroad while the currency is under pressure. The pound has weakened again this week, as covered in Egyptian Pound Slides Past 53 per Dollar.

The stabiliser is that the Saudi project already has momentum, with more than a third of the work done before the full contract was signed. That lowers the chance that the deal stalls at the start, a common problem for large plants.

Gulf money and Gulf contracts already play a large role in Egypt’s economy, alongside the United States, China and the IMF. That wider picture is set out in Egypt Foreign Powers 2026, Gulf, US, China and IMF.

What It Means for US Readers

US investors usually hold Egyptian stocks such as Elsewedy Electric through emerging and frontier market funds rather than directly. A large foreign contract can help sentiment, but the value to shareholders depends on margins that have not been disclosed.

The deal also shows Egyptian and Chinese contractors winning large power work in Saudi Arabia, a close US security partner. The main turbines, however, come from Siemens, a European supplier, not from a Chinese manufacturer.

For US companies selling into the Gulf, the project shows how Saudi power contracts tie builders to fixed timetables. Firms that supply services, spare parts or finance to such plants will watch whether the May 2029 target holds.

What Is Not Known

The share of the US$2.2 billion that belongs to the Egyptian partner, and its expected profit, have not been published. It is also unclear how the expansion relates to the US$800 million Rabigh plant with Siemens described in 2024.

The financing terms, the payment currency and the penalties for delays are not public. The release names May 2029 for commercial operation but gives no interim milestones.

The group’s disclosure to the Egyptian Exchange on the contract was not available for review. The figures here come from the joint venture’s release, as published by Zawya and Mubasher, and from TradeArabia’s report.

Frequently Asked Questions

What did Elsewedy Electric sign in Saudi Arabia?

Its power projects arm and China’s Sinohydro signed a contract worth about US$2.2 billion for the Rabigh 2 power plant expansion. The deal was announced on Tuesday 13 October.

How big is the Rabigh 2 expansion?

The gas-fired combined-cycle plant will add 2.3 gigawatts of capacity in Rabigh, on Saudi Arabia’s Red Sea coast. Commercial operation is targeted for May 2029.

Who awarded the contract?

Al Mourjan Two for Electricity Company awarded it as the project company. TradeArabia said the company was set up by Acwa Power and Saudi Energy.

Why does the deal matter to US investors?

US investors usually reach Egyptian stocks through emerging and frontier market funds. The contract can lift the order book, but Elsewedy’s share and margin are not yet public.

How far along is the project?

Work started earlier under a limited notice to proceed, and overall progress exceeds 39%. The partners also report more than five million safe man-hours.

Sources: Joint venture release, Rabigh 2 EPC contract, 13 October 2026 (via Zawya); Mubasher, Elsewedy-Sinohydro JV signs Rabigh 2 contract, 13 October 2026; TradeArabia via Zawya, Elsewedy joint venture secures US$2.2 billion project, 14 October 2026; Elsewedy Electric, company history; Enterprise, Elsewedy and Siemens Rabigh plant, 25 September 2024.

Editorial responsibility: Matthias Camenzind, Editor-in-Chief · Editorial standards · Report an error

Part of our ongoing coverage

Africa: The New Scramble — the great-power contest over the continent.

More from Northern Africa

Africa Intelligence

One email, every weekday morning. African markets, politics and business — filed from our newsroom in Rio.

Yesterday’s subject line: “Kenya court lets US$1.6B US health deal proceed”

Free. We send a confirmation link first — nothing arrives until you click it. Unsubscribe with one click in any edition. If you stop opening us for 30 days we stop sending by ourselves, as we assume the interest is no longer there. See our privacy policy. We never share your email.

Rotate for Best Experience

This report is optimized for landscape viewing. Rotate your phone for the full experience.