IBOV 171,906.72 ▲ 0.51% IPSA 11,537.98 ▲ 1.76% IPC MEX 65,770.85 ▲ 0.06% MERVAL 2,995,129 ▲ 2.81% COLCAP 2,510.72 ▲ 2.09% BVL PERÚ 60,222.25 ▼ 0.17% USD/BRL5.15▲ 0.02% USD/MXN16.94▼ 0.03% USD/CLP911.58▼ 0.14% USD/COP3,057▲ 0.42% USD/PEN3.35▼ 0.01% USD/ARS1,509▲ 0.63% USD/UYU40.18▼ 0.03% USD/PYG5,989▼ 0.11% USD/BOB11.44▲ 0.09% USD/DOP58.34▲ 0.64% USD/CRC446.05▼ 0.89% USD/GTQ7.62▼ 0.04% USD/HNL26.82▲ 0.02% USD/NIO36.62▲ 0.58% USD/VES783.11▲ 0.53% USD/PAB1.00— 0.00% USD/BZD2.00— 0.00% USD/JMD 157.28 — 0.00% USD/TTD6.72▲ 0.25% EUR/BRL6.01▲ 0.29% BRENT 88.88 ▼ 0.03% WTI 83.11 ▼ 0.11% IRON ORE 161.91 — — COPPER 6.61 ▲ 0.03% GOLD 4,461 ▲ 1.78% SILVER 65.59 ▲ 1.26% SOY 1,184 ▲ 3.20% CORN 480.50 ▲ 10.02% WHEAT 655.00 ▲ 3.93% COFFEE 317.25 ▼ 5.51% SUGAR 16.43 ▼ 1.79% ORANGE JUICE 138.55 ▼ 0.47% COTTON 85.03 ▲ 2.33% COCOA 5,719 ▲ 3.18% BEEF 223.60 ▼ 3.93% CATTLE 339.10 ▼ 3.16% LITHIUM 75.20 ▲ 1.47% PETR4 41.64 ▼ 0.05% VALE3 72.97 ▲ 0.83% ITUB4 38.60 ▼ 1.03% BBDC4 16.85 ▲ 0.36% ABEV3 14.89 ▼ 0.80% BBAS3 19.37 ▲ 0.47% B3SA3 14.26 ▼ 0.21% WEGE3 47.59 ▲ 0.49% PRIO3 59.14 ▼ 0.19% SUZB3 41.33 ▲ 2.35% RENT3 34.68 ▼ 0.09% AZZA3 15.89 ▼ 2.63% CSAN3 3.22 ▼ 1.83% RAIZ4 0.25 — 0.00% PCAR3 2.75 ▼ 0.36% GMAT3 3.65 ▼ 1.08% PSSA3 48.13 ▼ 0.54% CVCB3 1.33 ▼ 2.92% POSI3 3.36 ▲ 2.44% SLCE3 13.34 ▲ 0.30% NATU3 8.14 ▼ 0.73% IBOV 171,906.72 ▲ 0.51% IPSA 11,537.98 ▲ 1.76% IPC MEX 65,770.85 ▲ 0.06% MERVAL 2,995,129 ▲ 2.81% COLCAP 2,510.72 ▲ 2.09% BVL PERÚ 60,222.25 ▼ 0.17% USD/BRL 5.16 ▲ 0.01% USD/MXN 17.06 ▼ 0.24% USD/CLP 913.98 ▲ 0.04% USD/COP 3,140 ▲ 0.03% USD/PEN 3.36 ▼ 0.66% USD/ARS 1,493 ▲ 0.10% USD/UYU 40.27 ▲ 1.24% USD/PYG 5,939 ▲ 1.68% USD/BOB 11.64 ▼ 0.76% USD/DOP 58.34 ▲ 1.25% USD/CRC 445.92 ▲ 0.89% USD/GTQ 7.62 ▲ 2.21% USD/HNL 26.79 ▲ 1.57% USD/NIO 36.62 ▲ 0.69% USD/VES 762.44 ▼ 0.13% USD/PAB 1.00 — 0.00% USD/BZD 2.00 — 0.00% USD/JMD 157.28 — 0.00% USD/TTD 6.70 ▲ 0.61% EUR/BRL 5.95 ▲ 1.01% BRENT 88.88 ▼ 0.03% WTI 83.11 ▼ 0.11% IRON ORE 161.91 — — COPPER 6.61 ▲ 0.03% GOLD 4,461 ▲ 1.78% SILVER 65.59 ▲ 1.26% SOY 1,184 ▲ 3.20% CORN 480.50 ▲ 10.02% WHEAT 655.00 ▲ 3.93% COFFEE 317.25 ▼ 5.51% SUGAR 16.43 ▼ 1.79% ORANGE JUICE 138.55 ▼ 0.47% COTTON 85.03 ▲ 2.33% COCOA 5,719 ▲ 3.18% BEEF 223.60 ▼ 3.93% CATTLE 339.10 ▼ 3.16% LITHIUM 75.20 ▲ 1.47% PETR4 41.64 ▼ 0.05% VALE3 72.97 ▲ 0.83% ITUB4 38.60 ▼ 1.03% BBDC4 16.85 ▲ 0.36% ABEV3 14.89 ▼ 0.80% BBAS3 19.37 ▲ 0.47% B3SA3 14.26 ▼ 0.21% WEGE3 47.59 ▲ 0.49% PRIO3 59.14 ▼ 0.19% SUZB3 41.33 ▲ 2.35% RENT3 34.68 ▼ 0.09% AZZA3 15.89 ▼ 2.63% CSAN3 3.22 ▼ 1.83% RAIZ4 0.25 — 0.00% PCAR3 2.75 ▼ 0.36% GMAT3 3.65 ▼ 1.08% PSSA3 48.13 ▼ 0.54% CVCB3 1.33 ▼ 2.92% POSI3 3.36 ▲ 2.44% SLCE3 13.34 ▲ 0.30% NATU3 8.14 ▼ 0.73%
since 2009
Tuesday, August 25, 2026

Politics - Brazil Rio de Janeiro

PAC Progress in São Paulo

By · February 22, 2011 · 3 min read

Daily Brief

The morning intel from across Latin America. Free.

By subscribing you agree to our privacy policy. We never share your email.

By Anna Fitzpatrick, Contributing Reporter

SÃO PAULO, BRAZIL – The initial growth acceleration program, or PAC, planned for 2007 to 2010, earmarked investments of R$504 billion (US$306 billion) to be spent on infrastructure issues.  Of that, R$346.5 billion was earmarked for projects in São Paulo, the state responsible for 34 percent of the country’s GDP (Gross Domestic Product).

President Dilma Rousseff was nicknamed ' The mother of PAC'
President Rousseff nicknamed 'The mother of PAC' by Lula, photo by Wilson Dias/ABr.
One-stop reference
Company Intelligence
Every listed company in Latin America — financials, ownership and structure for 1,450+ companies across 26 exchanges, in one place.
Browse the directory →
RT
Ask Rio Times
This story and the bigger picture.
Open the full Ask Rio Times →

Infrastructure projects have been the priority nationwide, and of the nearly 14,000 projects included in PAC and PAC2, approximately 1,200, or just 8 percent, were destined for São Paulo.

The investments sought to expand the existing logistical infrastructure, improve traffic in metropolitan areas and eliminate operational bottlenecks in the ports and railways.

Perhaps the most tangible PAC investments were defined to increase São Paulo’s 62.3 km of metro lines to be on par with other large cities, such as Mexico City (200 km of subway), Paris (213 km) and Madrid (283.8 km).

Investments of R$2.1 billion have been made to expand the Line 2 metro, also called the “Paulista Line” because it goes along much of the Avenida Paulista, connecting Vila Madalena and Vila Prudente stations.  Started in 2009, the line is still under construction.

The construction of Line 4 metro has also been part of PAC infrastructure plans. New stations on Avenida Faria Lima and Avenida Paulista were inaugurated in 2010 and will go some way towards easing stressed bus routes in some of the city’s most important and densely populated districts from the city center to the West Zone. However, work is behind schedule and stations along the line are still closed and not expected to open until next year.

Another massive project included in PAC was the proposal for the high speed rail link between Rio de Janeiro and São Paulo.  Plans for the R$33.1 billion railway project have been postponed a number of times and the project has yet to pass the tendering stage, which is now scheduled for the end of April.

São Paulo's new Faria Lima station on Line 4, photo by Milton Jung/Flickr Creative Commons License.

Fears that the train will not be in place before the 2014 World Cup were confirmed in December by Bernardo Figueiredo, the General Manager of the ANTT (Ministry of Transport), who stated he hoped it would be complete by the Olympics in 2016.

Instead of expanding, the PAC infrastructure program Porto Sem Papel (ports without paper), aimed to reduce paperwork for port operations, diminishing a vessel’s time stopped in port by 25 percent and halving the time it takes to export cargo.  Despite a pilot run last year at the Port of Santos, the program has yet to be put into full service.

Non-transport related projects included favela upgrading in Heliopolis, new homes in the area of Embu and investment in a new stadium for the 2014 World Cup. Deadlines have already been missed for the new stadium development, and the city has been warned it may lose the opportunity to host games.

Though only 12 percent of the projects (137 projects) had been completed by April 2010 according to a report by NGO Contas Aberta, São Paulo has not been the only place facing project delays. According to the report, progress nationwide has been slow due to excessive bureaucracy, environmental problems and stalling in the release of funds.

Critics aside, the second phase of the policy, PAC 2 has been launched, with the Lula administration pledging a further R$958.9 billion. Minister of Planning, Miriam Belchior announced that proposed projects of PAC2 would begin in March this year.

Read More from The Rio Times

The Rio Times · Power Map
See who really holds power in Latin America
Click to open the Power Map

Rotate for Best Experience

This report is optimized for landscape viewing. Rotate your phone for the full experience.