IBOV 175,168.74 ▲ 0.02% IPSA 11,470.79 ▲ 0.89% IPC MEX 65,829.98 ▼ 0.55% MERVAL 2,992,575 ▼ 0.29% COLCAP 2,488.20 ▼ 0.06% BVL PERÚ 60,779.49 ▲ 0.58% USD/BRL5.21▲ 1.02% USD/MXN17.04▲ 0.33% USD/CLP927.28▲ 0.10% USD/COP3,210▲ 2.62% USD/PEN3.35▼ 0.04% USD/ARS1,514▲ 0.08% USD/UYU40.27▲ 1.50% USD/PYG5,900▲ 0.50% USD/BOB11.78▲ 3.59% USD/DOP58.61▲ 0.96% USD/CRC446.65▲ 0.98% USD/GTQ7.62▲ 2.25% USD/HNL26.84▲ 0.40% USD/NIO36.62▼ 0.02% USD/VES789.69▼ 0.13% USD/PAB1.00— 0.00% USD/BZD2.00— 0.00% USD/JMD 157.28 — 0.00% USD/TTD6.72▲ 0.77% EUR/BRL6.04▲ 0.80% BRENT 88.88 ▼ 0.03% WTI 83.11 ▼ 0.11% IRON ORE 161.91 — — COPPER 6.61 ▲ 0.03% GOLD 4,461 ▲ 1.78% SILVER 65.59 ▲ 1.26% SOY 1,184 ▲ 3.20% CORN 480.50 ▲ 10.02% WHEAT 655.00 ▲ 3.93% COFFEE 317.25 ▼ 5.51% SUGAR 16.43 ▼ 1.79% ORANGE JUICE 138.55 ▼ 0.47% COTTON 85.03 ▲ 2.33% COCOA 5,719 ▲ 3.18% BEEF 223.60 ▼ 3.93% CATTLE 339.10 ▼ 3.16% LITHIUM 75.20 ▲ 1.47% PETR4 41.64 ▼ 0.05% VALE3 72.97 ▲ 0.83% ITUB4 38.60 ▼ 1.03% BBDC4 16.85 ▲ 0.36% ABEV3 14.89 ▼ 0.80% BBAS3 19.37 ▲ 0.47% B3SA3 14.26 ▼ 0.21% WEGE3 47.59 ▲ 0.49% PRIO3 59.14 ▼ 0.19% SUZB3 41.33 ▲ 2.35% RENT3 34.68 ▼ 0.09% AZZA3 15.89 ▼ 2.63% CSAN3 3.22 ▼ 1.83% RAIZ4 0.25 — 0.00% PCAR3 2.75 ▼ 0.36% GMAT3 3.65 ▼ 1.08% PSSA3 48.13 ▼ 0.54% CVCB3 1.33 ▼ 2.92% POSI3 3.36 ▲ 2.44% SLCE3 13.34 ▲ 0.30% NATU3 8.14 ▼ 0.73% IBOV 175,168.74 ▲ 0.02% IPSA 11,470.79 ▲ 0.89% IPC MEX 65,829.98 ▼ 0.55% MERVAL 2,992,575 ▼ 0.29% COLCAP 2,488.20 ▼ 0.06% BVL PERÚ 60,779.49 ▲ 0.58% USD/BRL 5.16 ▲ 0.01% USD/MXN 17.06 ▼ 0.24% USD/CLP 913.98 ▲ 0.04% USD/COP 3,140 ▲ 0.03% USD/PEN 3.36 ▼ 0.66% USD/ARS 1,493 ▲ 0.10% USD/UYU 40.27 ▲ 1.24% USD/PYG 5,939 ▲ 1.68% USD/BOB 11.64 ▼ 0.76% USD/DOP 58.34 ▲ 1.25% USD/CRC 445.92 ▲ 0.89% USD/GTQ 7.62 ▲ 2.21% USD/HNL 26.79 ▲ 1.57% USD/NIO 36.62 ▲ 0.69% USD/VES 762.44 ▼ 0.13% USD/PAB 1.00 — 0.00% USD/BZD 2.00 — 0.00% USD/JMD 157.28 — 0.00% USD/TTD 6.70 ▲ 0.61% EUR/BRL 5.95 ▲ 1.01% BRENT 88.88 ▼ 0.03% WTI 83.11 ▼ 0.11% IRON ORE 161.91 — — COPPER 6.61 ▲ 0.03% GOLD 4,461 ▲ 1.78% SILVER 65.59 ▲ 1.26% SOY 1,184 ▲ 3.20% CORN 480.50 ▲ 10.02% WHEAT 655.00 ▲ 3.93% COFFEE 317.25 ▼ 5.51% SUGAR 16.43 ▼ 1.79% ORANGE JUICE 138.55 ▼ 0.47% COTTON 85.03 ▲ 2.33% COCOA 5,719 ▲ 3.18% BEEF 223.60 ▼ 3.93% CATTLE 339.10 ▼ 3.16% LITHIUM 75.20 ▲ 1.47% PETR4 41.64 ▼ 0.05% VALE3 72.97 ▲ 0.83% ITUB4 38.60 ▼ 1.03% BBDC4 16.85 ▲ 0.36% ABEV3 14.89 ▼ 0.80% BBAS3 19.37 ▲ 0.47% B3SA3 14.26 ▼ 0.21% WEGE3 47.59 ▲ 0.49% PRIO3 59.14 ▼ 0.19% SUZB3 41.33 ▲ 2.35% RENT3 34.68 ▼ 0.09% AZZA3 15.89 ▼ 2.63% CSAN3 3.22 ▼ 1.83% RAIZ4 0.25 — 0.00% PCAR3 2.75 ▼ 0.36% GMAT3 3.65 ▼ 1.08% PSSA3 48.13 ▼ 0.54% CVCB3 1.33 ▼ 2.92% POSI3 3.36 ▲ 2.44% SLCE3 13.34 ▲ 0.30% NATU3 8.14 ▼ 0.73%
since 2009
Friday, August 28, 2026

Argentina’s Neuquen Maps 750 Kilometres of Roads to Take Vaca Muerta West to Chile

By · August 28, 2026 · 6 min read

Daily Brief

The morning intel from across Latin America. Free.

By subscribing you agree to our privacy policy. We never share your email.

ARGENTINA · ENERGY

Key Facts

What happened: Argentina’s Neuquén province took a 750-kilometre road plan to Chile to tie Vaca Muerta to Pacific ports.

The corridor: The route would run parallel to the Andes, linking 20 towns, 20 lakes and the border passes.

The energy deal: Neuquén and Chile’s Biobío region set up technical tables to move shale gas west toward Asia.

The catch: The pipelines and ports exist, but the Argentine side of the key border pass is still gravel.

Who is driving it: Governors Rolando Figueroa of Neuquén and Sergio Giacaman of Biobío met in Concepción on Thursday.

What comes next: Paving toward the Pichachén pass starts in March, and Biobío joins Neuquén’s oil fair in October.

Neuquén, the Argentine province that holds most of the Vaca Muerta shale, wants to pave 750 kilometres of Andean roads toward Chile. Its governor signed up Chile’s Biobío region this week to technical work on moving gas and oil west to the Pacific.

Excavator moving dirt on a construction site
The Pichachén pass on the Argentine-Chilean border, the planned gateway between Vaca Muerta and the Pacific. (Photo: Vrac, Wikimedia Commons, CC BY-SA 4.0)
One-stop reference
Company Intelligence
Every listed company in Latin America — financials, ownership and structure for 1,450+ companies across 26 exchanges, in one place.
Browse the directory →
RT
Ask Rio Times
17 years of Latin America reporting, on demand.
Open the full Ask Rio Times →

What Neuquén took to Concepción

Governor Rolando Figueroa led a delegation of ministers to Concepción, the capital of Chile’s Biobío region, on Thursday. His counterpart Sergio Giacaman hosted, and Chile’s energy minister Ximena Rincón joined the sessions.

The meeting turned June’s joint declarations on energy cooperation into working structures. Technical tables will now address road projects, border control infrastructure, trade facilitation and customs digitalisation.

Three priorities frame the agenda. Short-term gas integration comes first, then Biobío as an export corridor for Argentine gas to Asia, and finally a logistics and industrial services platform.

Figueroa was blunt about the logic. The pipeline to Chile is running at about 10 percent of capacity, he said, so why not fill it.

The 750-kilometre idea

The road plan is the physical backbone of the strategy. Neuquén proposes roughly 750 kilometres of linked routes running parallel to the Andes and to the emblematic Route 40.

The corridor would connect 20 towns and 20 lakes with the international passes to Chile. Three of the province’s passes are paved today, and the government wants three more.

Mamuil Malal’s paving should finish in March, and Hua Hum is scheduled for asphalt from 2028. The strategic prize is Pichachén in the north, where paving also starts in March across more than 200 related kilometres.

Figueroa said work is already advancing on 250 kilometres from the Pichachén border complex. The idea is a route that links Biobío to Neuquén, Río Negro, Buenos Aires and La Pampa.

Why Chile wants the gas, and why Argentina needs the door

Vaca Muerta is one of the world’s largest shale formations, and it now supplies about 70 percent of the country’s oil and gas. The province that owns it is short of export routes, not of resources.

Chile offers the Pacific hardware the province lacks. The Gasoducto del Pacífico already crosses the Andes to Biobío, and deep-water ports like Talcahuano and Coronel face Asia directly.

The oil link reopened first. In December 2025, Chile’s state oil company ENAP signed crude supply contracts with Vaca Muerta operators until June 2033, reviving the idle Transandino pipeline.

For Asian buyers the geography is compelling. Shipping from Chile’s coast to China, Japan or Korea skips both the Panama Canal and the Magellan Strait.

The Pacific push does not replace the Atlantic one. The national government is building the Vaca Muerta Oil Sur pipeline to Punta Colorada on its own coast, and officials describe Chile as a complementary exit.

What still has to happen

The honest summary is that the maps are ahead of the asphalt. Pichachén remains gravel on the Argentine side, and winter snow still closes the high passes for days.

Money is partly in place. A US$250 million loan from CAF, the Latin American development bank, is before the provincial legislature for the northern routes.

Customs integration is the quieter battle. Giacaman said he will press Chile’s customs service so Pichachén can handle international cargo as an integrated border complex.

The next public milestone comes in October. Biobío’s government will attend Neuquén’s oil and gas fair, where the corridor will be sold to the industry itself.

Frequently Asked Questions

What is Vaca Muerta?

Vaca Muerta is a vast shale formation in Argentina’s Neuquén province, one of the largest unconventional oil and gas reserves in the world. It now provides about 70 percent of the country’s oil and gas.

What did Neuquén and Biobío agree in Concepción?

They formed technical working tables on roads, border infrastructure, trade facilitation and customs digitalisation. The goal is moving Argentine hydrocarbons west to Pacific ports and Asian markets.

What is the 750-kilometre road plan?

Neuquén proposes linking about 750 kilometres of routes parallel to the Andes, connecting 20 towns and the border passes to Chile. Paving toward the Pichachén pass is due to start in March.

Does energy already flow west through Chile?

Yes. Since December 2025, Chile’s ENAP has bought Vaca Muerta crude under contracts to 2033 through the revived Transandino pipeline. A gas pipeline to Biobío exists but runs near 10 percent of capacity.

Why ship to Asia from Chile instead of Argentina?

Pacific ports like Talcahuano offer direct routes to China, Japan and Korea without the Panama Canal or Magellan Strait. Neuquén is also closer to Biobío’s ports than to the country’s own Atlantic terminals.

Connected Coverage

We covered the parallel paving push at the Valdivia committee in Neuquén pushes to pave three Argentina-Chile border crossings and the shale build-out in Argentina’s shale boom accelerates. More from the country on our Argentina hub.

Sources: Radio Universidad de Concepción (27 August 2026); Diario 7 Lagos (27 August 2026); LU17 (28 August 2026); Diario Concepción (11 June 2026); Revista Petroquímica; Ámbito Energía.

This article was produced by The Rio Times’ automated newsroom system. How we use AI · Report an error

Read More from The Rio Times

The Rio Times · Power Map
See who really holds power in Latin America
Click to open the Power Map

Rotate for Best Experience

This report is optimized for landscape viewing. Rotate your phone for the full experience.