IBOV 171,906.72 ▲ 0.51% IPSA 11,537.98 ▲ 1.76% IPC MEX 65,770.85 ▲ 0.06% MERVAL 2,995,129 — 0.00% COLCAP 2,510.72 ▲ 2.09% BVL PERÚ 60,222.25 ▼ 0.17% USD/BRL5.15▼ 0.02% USD/MXN16.94▼ 0.06% USD/CLP908.74▼ 0.45% USD/COP3,051▲ 0.23% USD/PEN3.35▲ 0.04% USD/ARS1,510▲ 0.03% USD/UYU40.18▼ 0.03% USD/PYG5,989▼ 0.11% USD/BOB11.44▲ 0.09% USD/DOP58.38▲ 0.70% USD/CRC446.05▼ 0.89% USD/GTQ7.62▼ 0.04% USD/HNL26.82▲ 0.02% USD/NIO36.62▲ 0.58% USD/VES783.11▲ 0.53% USD/PAB1.00— 0.00% USD/BZD2.00— 0.00% USD/JMD 157.28 — 0.00% USD/TTD6.72▲ 0.25% EUR/BRL6.01▲ 0.27% BRENT 88.88 ▼ 0.03% WTI 83.11 ▼ 0.11% IRON ORE 161.91 — — COPPER 6.61 ▲ 0.03% GOLD 4,461 ▲ 1.78% SILVER 65.59 ▲ 1.26% SOY 1,184 ▲ 3.20% CORN 480.50 ▲ 10.02% WHEAT 655.00 ▲ 3.93% COFFEE 317.25 ▼ 5.51% SUGAR 16.43 ▼ 1.79% ORANGE JUICE 138.55 ▼ 0.47% COTTON 85.03 ▲ 2.33% COCOA 5,719 ▲ 3.18% BEEF 223.60 ▼ 3.93% CATTLE 339.10 ▼ 3.16% LITHIUM 75.20 ▲ 1.47% PETR4 41.64 ▼ 0.05% VALE3 72.97 ▲ 0.83% ITUB4 38.60 ▼ 1.03% BBDC4 16.85 ▲ 0.36% ABEV3 14.89 ▼ 0.80% BBAS3 19.37 ▲ 0.47% B3SA3 14.26 ▼ 0.21% WEGE3 47.59 ▲ 0.49% PRIO3 59.14 ▼ 0.19% SUZB3 41.33 ▲ 2.35% RENT3 34.68 ▼ 0.09% AZZA3 15.89 ▼ 2.63% CSAN3 3.22 ▼ 1.83% RAIZ4 0.25 — 0.00% PCAR3 2.75 ▼ 0.36% GMAT3 3.65 ▼ 1.08% PSSA3 48.13 ▼ 0.54% CVCB3 1.33 ▼ 2.92% POSI3 3.36 ▲ 2.44% SLCE3 13.34 ▲ 0.30% NATU3 8.14 ▼ 0.73% IBOV 171,906.72 ▲ 0.51% IPSA 11,537.98 ▲ 1.76% IPC MEX 65,770.85 ▲ 0.06% MERVAL 2,995,129 — 0.00% COLCAP 2,510.72 ▲ 2.09% BVL PERÚ 60,222.25 ▼ 0.17% USD/BRL 5.16 ▲ 0.01% USD/MXN 17.06 ▼ 0.24% USD/CLP 913.98 ▲ 0.04% USD/COP 3,140 ▲ 0.03% USD/PEN 3.36 ▼ 0.66% USD/ARS 1,493 ▲ 0.10% USD/UYU 40.27 ▲ 1.24% USD/PYG 5,939 ▲ 1.68% USD/BOB 11.64 ▼ 0.76% USD/DOP 58.34 ▲ 1.25% USD/CRC 445.92 ▲ 0.89% USD/GTQ 7.62 ▲ 2.21% USD/HNL 26.79 ▲ 1.57% USD/NIO 36.62 ▲ 0.69% USD/VES 762.44 ▼ 0.13% USD/PAB 1.00 — 0.00% USD/BZD 2.00 — 0.00% USD/JMD 157.28 — 0.00% USD/TTD 6.70 ▲ 0.61% EUR/BRL 5.95 ▲ 1.01% BRENT 88.88 ▼ 0.03% WTI 83.11 ▼ 0.11% IRON ORE 161.91 — — COPPER 6.61 ▲ 0.03% GOLD 4,461 ▲ 1.78% SILVER 65.59 ▲ 1.26% SOY 1,184 ▲ 3.20% CORN 480.50 ▲ 10.02% WHEAT 655.00 ▲ 3.93% COFFEE 317.25 ▼ 5.51% SUGAR 16.43 ▼ 1.79% ORANGE JUICE 138.55 ▼ 0.47% COTTON 85.03 ▲ 2.33% COCOA 5,719 ▲ 3.18% BEEF 223.60 ▼ 3.93% CATTLE 339.10 ▼ 3.16% LITHIUM 75.20 ▲ 1.47% PETR4 41.64 ▼ 0.05% VALE3 72.97 ▲ 0.83% ITUB4 38.60 ▼ 1.03% BBDC4 16.85 ▲ 0.36% ABEV3 14.89 ▼ 0.80% BBAS3 19.37 ▲ 0.47% B3SA3 14.26 ▼ 0.21% WEGE3 47.59 ▲ 0.49% PRIO3 59.14 ▼ 0.19% SUZB3 41.33 ▲ 2.35% RENT3 34.68 ▼ 0.09% AZZA3 15.89 ▼ 2.63% CSAN3 3.22 ▼ 1.83% RAIZ4 0.25 — 0.00% PCAR3 2.75 ▼ 0.36% GMAT3 3.65 ▼ 1.08% PSSA3 48.13 ▼ 0.54% CVCB3 1.33 ▼ 2.92% POSI3 3.36 ▲ 2.44% SLCE3 13.34 ▲ 0.30% NATU3 8.14 ▼ 0.73%
since 2009
Tuesday, August 25, 2026

World Cup Host City: Cuiabá Progress

By · May 1, 2012 · 2 min read

Daily Brief

The morning intel from across Latin America. Free.

By subscribing you agree to our privacy policy. We never share your email.

By Robbie Blakeley, Senior Contributing Reporter

RIO DE JANEIRO, BRAZIL – Following a 2010 series of stories detailing the World Cup cities in Brazil, it is time again to refocus on the 2014 World Cup progress, and specifically looking at the various stadium renovations. The first to review is in the state of Mato Grosso, and the Arena Pantanal, situated in the state’s capital Cuiabá.

Arena Pantanal, Brazil News
An artist's impression of how the finished Arena Pantanal will look, photo by AgeCopa.
One-stop reference
Company Intelligence
Every listed company in Latin America — financials, ownership and structure for 1,450+ companies across 26 exchanges, in one place.
Browse the directory →
RT
Ask Rio Times
17 years of Latin America reporting, on demand.
Open the full Ask Rio Times →

The stadium is being built according to a traditional English model by constructors Santa Bárbara and Mendes Júnior. In accordance with the English model there will be no running track around the perimeter of the pitch.

This will leave the fans much closer to the action and increase the atmosphere significantly. Four separate stands rather than an all-encompassing bowl in the style of Rio’s Maracanã surround the pitch.

While building work has progressed, the developers have constantly kept one eye on environmental issues as well as receiving praise from FIFA on a recent visit as one of the most advanced and organized plans. The wood being used to build the arena comes only from certified sources and all waste is recycled.

The entire project will cost approximately R$342 million, a little over a third of the R$957 million being lavished on the Maracanã. The money for the Pantanal is coming from the Mato Grosso state government as well as private funding from investors.

When each stadium was allotted its games for the 2014 tournament, FIFA, world football’s governing body, decreed that the Arena Pantanal would receive four games during the competition, all during the group stages. The games will take in place in June, on the 13th, 17th, 21st and 24th.

Upon completion, the stadium will have a capacity of 42,968, all-seated to keep in line with FIFA regulations, and is situated where the city’s ancient Estadio Jose Fragelli used to sit in the Verdão (Big Green) neighborhood of the metropolis. However, once the Copa has left town, the capacity is set to be reduced to just 28,000 due to Cuiabá not being a traditional footballing stronghold.

Building work is making good progress at the Pantanal, photo released by the LOC.

But fortunately the stadium is being built for multipurpose. To make up for the lack of football in the area music shows, exhibitions and fairs should all be hosted at the Pantanal.

In addition shops, restaurants, hotels and a leisure park will all accompany the stadium to keep tourists from twiddling their thumbs whilst visiting the “Green City.”

Building work began in April 2010 and is on course to be finished in December of this year. Unfortunately, despite being ready in time, the Pantanal will not host Confederations Cup matches in 2013, that honor going to Rio, Belo Horizonte, Brasília and Fortaleza, with the possible use of Salvador and Recife.

Unlike several building works taking place across Brazil for the World Cup, the Pantanal is not causing any headaches. The work is half done and is still scheduled to finish on-time.

There are 650 workers working on construction at the time of writing with work advanced on all four stands, as well as one of the access tunnels already completed. As kick-off time draws closer the city of Cuiabá expects to be ready and waiting.

Read More from The Rio Times

The Rio Times · Power Map
See who really holds power in Latin America
Click to open the Power Map

Rotate for Best Experience

This report is optimized for landscape viewing. Rotate your phone for the full experience.