IBOV 174,586.26 ▲ 0.01% IPSA 11,369.18 ▼ 0.71% IPC MEX 66,191.11 ▼ 0.15% MERVAL 3,024,971 — 0.00% COLCAP 2,504.68 ▼ 0.15% BVL PERÚ 60,449.35 ▲ 0.30% USD/BRL5.15— 0.00% USD/MXN16.96▲ 0.04% USD/CLP921.84▲ 0.02% USD/COP3,127▲ 1.06% USD/PEN3.35▲ 0.26% USD/ARS1,510▼ 0.28% USD/UYU40.18▲ 1.55% USD/PYG5,957▲ 0.99% USD/BOB11.50▲ 1.47% USD/DOP58.01▲ 0.33% USD/CRC450.21▲ 2.07% USD/GTQ7.62▲ 2.21% USD/HNL26.82▲ 0.34% USD/NIO36.62▲ 0.79% USD/VES789.35▲ 0.36% USD/PAB1.00— 0.00% USD/BZD2.00— 0.00% USD/JMD 157.28 — 0.00% USD/TTD6.73▲ 1.10% EUR/BRL6.00— 0.00% BRENT 88.88 ▼ 0.03% WTI 83.11 ▼ 0.11% IRON ORE 161.91 — — COPPER 6.61 ▲ 0.03% GOLD 4,461 ▲ 1.78% SILVER 65.59 ▲ 1.26% SOY 1,184 ▲ 3.20% CORN 480.50 ▲ 10.02% WHEAT 655.00 ▲ 3.93% COFFEE 317.25 ▼ 5.51% SUGAR 16.43 ▼ 1.79% ORANGE JUICE 138.55 ▼ 0.47% COTTON 85.03 ▲ 2.33% COCOA 5,719 ▲ 3.18% BEEF 223.60 ▼ 3.93% CATTLE 339.10 ▼ 3.16% LITHIUM 75.20 ▲ 1.47% PETR4 41.64 ▼ 0.05% VALE3 72.97 ▲ 0.83% ITUB4 38.60 ▼ 1.03% BBDC4 16.85 ▲ 0.36% ABEV3 14.89 ▼ 0.80% BBAS3 19.37 ▲ 0.47% B3SA3 14.26 ▼ 0.21% WEGE3 47.59 ▲ 0.49% PRIO3 59.14 ▼ 0.19% SUZB3 41.33 ▲ 2.35% RENT3 34.68 ▼ 0.09% AZZA3 15.89 ▼ 2.63% CSAN3 3.22 ▼ 1.83% RAIZ4 0.25 — 0.00% PCAR3 2.75 ▼ 0.36% GMAT3 3.65 ▼ 1.08% PSSA3 48.13 ▼ 0.54% CVCB3 1.33 ▼ 2.92% POSI3 3.36 ▲ 2.44% SLCE3 13.34 ▲ 0.30% NATU3 8.14 ▼ 0.73% IBOV 174,586.26 ▲ 0.01% IPSA 11,369.18 ▼ 0.71% IPC MEX 66,191.11 ▼ 0.15% MERVAL 3,024,971 — 0.00% COLCAP 2,504.68 ▼ 0.15% BVL PERÚ 60,449.35 ▲ 0.30% USD/BRL 5.16 ▲ 0.01% USD/MXN 17.06 ▼ 0.24% USD/CLP 913.98 ▲ 0.04% USD/COP 3,140 ▲ 0.03% USD/PEN 3.36 ▼ 0.66% USD/ARS 1,493 ▲ 0.10% USD/UYU 40.27 ▲ 1.24% USD/PYG 5,939 ▲ 1.68% USD/BOB 11.64 ▼ 0.76% USD/DOP 58.34 ▲ 1.25% USD/CRC 445.92 ▲ 0.89% USD/GTQ 7.62 ▲ 2.21% USD/HNL 26.79 ▲ 1.57% USD/NIO 36.62 ▲ 0.69% USD/VES 762.44 ▼ 0.13% USD/PAB 1.00 — 0.00% USD/BZD 2.00 — 0.00% USD/JMD 157.28 — 0.00% USD/TTD 6.70 ▲ 0.61% EUR/BRL 5.95 ▲ 1.01% BRENT 88.88 ▼ 0.03% WTI 83.11 ▼ 0.11% IRON ORE 161.91 — — COPPER 6.61 ▲ 0.03% GOLD 4,461 ▲ 1.78% SILVER 65.59 ▲ 1.26% SOY 1,184 ▲ 3.20% CORN 480.50 ▲ 10.02% WHEAT 655.00 ▲ 3.93% COFFEE 317.25 ▼ 5.51% SUGAR 16.43 ▼ 1.79% ORANGE JUICE 138.55 ▼ 0.47% COTTON 85.03 ▲ 2.33% COCOA 5,719 ▲ 3.18% BEEF 223.60 ▼ 3.93% CATTLE 339.10 ▼ 3.16% LITHIUM 75.20 ▲ 1.47% PETR4 41.64 ▼ 0.05% VALE3 72.97 ▲ 0.83% ITUB4 38.60 ▼ 1.03% BBDC4 16.85 ▲ 0.36% ABEV3 14.89 ▼ 0.80% BBAS3 19.37 ▲ 0.47% B3SA3 14.26 ▼ 0.21% WEGE3 47.59 ▲ 0.49% PRIO3 59.14 ▼ 0.19% SUZB3 41.33 ▲ 2.35% RENT3 34.68 ▼ 0.09% AZZA3 15.89 ▼ 2.63% CSAN3 3.22 ▼ 1.83% RAIZ4 0.25 — 0.00% PCAR3 2.75 ▼ 0.36% GMAT3 3.65 ▼ 1.08% PSSA3 48.13 ▼ 0.54% CVCB3 1.33 ▼ 2.92% POSI3 3.36 ▲ 2.44% SLCE3 13.34 ▲ 0.30% NATU3 8.14 ▼ 0.73%
since 2009
Thursday, August 27, 2026

Brazil Business

Pecém Terminal Reshapes Fuel Supply in Brazil’s Northeast

By · August 27, 2026 · 6 min read

Daily Brief

The morning intel from across Latin America. Free.

By subscribing you agree to our privacy policy. We never share your email.

Brazil · ENERGY

Key Facts

  • Location The Pecém fuel terminal sits in São Gonçalo do Amarante, in Ceará state.
  • Investment The declared cost is R$640 million, or about US$124 million at current rates.
  • Capacity Projected storage is 240,000 cubic metres of petroleum products, biofuels and chemicals.
  • Jobs Construction employs about 1,040 people, with roughly 100 permanent posts planned afterwards.
  • Reach Executives expect the site to cover 20 percent of Northeast Brazil’s fuel consumption.

The Ceará project replaces Fortaleza’s ageing Mucuripe tank farm and stretches its reach across five states.

Grupo Dislub Equador is finishing the largest fuel terminal now under construction in Brazil, at the Pecém port complex in Ceará. The Pecém fuel terminal is due to begin commercial operation during 2027.

Numbered white fuel storage tanks behind a fence, with pipelines running across wet grass
A fuel tank farm. The new terminal is designed for 240,000 cubic metres of storage.
One-stop reference
Company Intelligence
Every listed company in Latin America — financials, ownership and structure for 1,450+ companies across 26 exchanges, in one place.
Browse the directory →
RT
Ask Rio Times
Latin American markets, currencies and companies.
Open the full Ask Rio Times →

What is being built at Pecém

Grupo Dislub Equador is building a liquid fuels terminal inside the Pecém Industrial and Port Complex in Ceará, Brazil. The site lies in São Gonçalo do Amarante, on the Ceará coast west of Fortaleza.

The Pecém fuel terminal will hold petroleum derivatives, ethanol, other biofuels, chemicals and crude oil. The company and the Ceará industry federation describe it as the largest fuel terminal now being built in Brazil.

Storage capacity is projected at 240,000 cubic metres, with a first phase reported at 170,000 cubic metres. Earlier statements cited 220,000 cubic metres, so the final figure has moved as contracts were signed.

The declared investment is R$640 million (US$124 million), up from R$430 million (US$83 million) at groundbreaking. Funding combines the group’s own capital with a loan from Banco do Nordeste, the regional development bank.

Brazilian real figures here use the PTAX selling rate, the Central Bank of Brazil’s official daily dollar quote. That rate stood at 5.1604 reais per dollar on 26 August 2026.

Who Grupo Dislub Equador is

Grupo Dislub Equador is a fuel distributor headquartered in Recife, in the state of Pernambuco. It operates in 17 Brazilian states, concentrated in the North, Northeast and Centre-West.

The international trading house Vitol agreed in 2019 to buy 50 percent of the group. Brazil’s antitrust authority, the Conselho Administrativo de Defesa Econômica, cleared that deal the same year.

At the time of that deal the group ran Brazil’s sixth-largest service station network. Chief executive Marcelo Magalhães now wants about 800 sites by 2029, up from just over 500.

The company also runs Equador Log in Itacoatiara, Amazonas, described as the North’s largest private fuel terminal. The Pecém fuel terminal is the group’s tenth terminal and by far its largest.

Why Fortaleza’s old tank farm had to move

Ceará’s fuel storage has long sat at Mucuripe, beside the federal port in central Fortaleza. State and city authorities have pushed for years to move those tanks away from dense neighbourhoods.

State Law 19.012, published in August 2024, made the Mucuripe licences provisional and tied them to a relocation plan. The law also bars state bodies from approving expansions at the old site.

Companies affected include Raízen, Ipiranga, Vibra, Copa Energia, Nacional Gás and Ultragaz. A binding settlement with prosecutors sets 2027 as the end of their stay in that area.

Mucuripe holds up to 140,000 cubic metres today, below the capacity now projected at the new site. The Pecém fuel terminal is meant to absorb that volume and leave headroom for growth.

What energy security means in practice

About half of the liquid fuel consumed in Ceará arrives by road from other states. That haulage raises costs and feeds through to pump prices, according to the group’s chief executive.

Executives say the Pecém fuel terminal can cover roughly 20 percent of Northeast Brazil’s fuel consumption. The Ceará industry federation puts the local ambition higher, at the whole of the state’s demand.

Beyond Ceará, the company targets 37 percent of Rio Grande do Norte and 35 percent of Piauí. It also aims at 10 percent of Paraíba and 4 percent of Pernambuco, across some 400 municipalities.

The company describes a target market of more than four billion litres a year. Fortaleza’s Mucuripe port currently handles about 1.4 billion litres annually, on the same executives’ figures.

Neither the company nor Brazilian regulators have published how many days of regional demand the tanks would cover. That number remains unconfirmed.

Permits, approvals and what is still open

Environmental licensing runs through Ceará’s Superintendência Estadual do Meio Ambiente, the state environment agency known as Semace. The state environment council, the Conselho Estadual do Meio Ambiente, endorsed tank storage at Pecém.

Commercial operation still needs clearance from the Agência Nacional do Petróleo, Gás Natural e Biocombustíveis. That agency, Brazil’s oil, gas and biofuels regulator, is expected to authorise the site in 2027.

The land sits inside the Pecém complex, run by the state-owned Companhia do Complexo Industrial e Portuário do Pecém. Its management has publicly backed the project as a supply and price relief for Ceará.

Banco do Nordeste financed R$343 million (US$66 million) of the earlier R$430 million (US$83 million) budget. The group has not disclosed the financing split for the enlarged budget.

The customers already signed up

The company says nine contracts are signed for capacity at the Pecém fuel terminal. Named counterparties include Petrobras, Acelen, Vitol, Gunvor, PetroRecôncavo, Ale Combustíveis, Inpasa, Binatural and Transnordestina.

The PetroRecôncavo deal covers crude produced in the Potiguar Basin in Rio Grande do Norte. It adds about 40,000 cubic metres of dedicated tankage, roughly 250,000 barrels of crude oil.

Contract values were not disclosed by any party. The company says talks continue with further distributors under confidentiality clauses.

The design is an open tank farm, letting rival distributors rent space rather than build their own. Executives have suggested around 20 distributors could eventually use the site.

Rail, the port and the wider market

The terminal is designed to connect to the Transnordestina railway, which runs from Eliseu Martins in Piauí to Pecém. That line covers 1,206 kilometres and could push fuel deep into the interior.

The site is planned as a bonded terminal, able to handle imports and exports. Deep water at Pecém allows larger vessels than several other Northeast terminals can take.

Loading capacity is quoted at up to 1,500 trucks a day, served by 35 kilometres of pipelines. The Pecém complex moved almost 21 million tonnes of cargo during 2025.

Other operators are moving in as well, including a Supergasbras liquefied petroleum gas terminal licensed at Pecém. Construction was about 70 percent complete in May 2026 and was running four months ahead of schedule.

Frequently Asked Questions

Where exactly is the new Dislub Equador terminal?

It stands inside the Pecém Industrial and Port Complex in São Gonçalo do Amarante, Ceará. The Pecém fuel terminal is not in Pernambuco, although the group is headquartered in Recife.

When will the terminal start operating?

Construction was due to finish during 2026, with commercial operation planned for 2027. Regulatory clearance for the site is expected in the third quarter of 2027.

How much fuel will the terminal hold?

Projected storage is 240,000 cubic metres, with a first phase reported at 170,000 cubic metres. That compares with up to 140,000 cubic metres at the old Mucuripe tank farm in Fortaleza.

Connected Coverage

Grains Wrap: Corn Extends Rally, Soy Rebounds

Sources

This article was produced by The Rio Times’ automated newsroom system. How we use AI · Report an error

Read More from The Rio Times

The Rio Times · Power Map
See who really holds power in Latin America
Click to open the Power Map

Rotate for Best Experience

This report is optimized for landscape viewing. Rotate your phone for the full experience.