IBOV 164,796.05 ▼ 0.95% COLCAP 2,452.46 — — IPC MEX 69,355.62 ▲ 1.06% MERVAL 2,848,945 — — USD/BRL5.93▲ 0.01% USD/MXN19.20▲ 0.11% USD/CLP1,017▼ 0.59% USD/COP3,515▲ 6.21% USD/PEN3.47▲ 0.26% USD/ARS1,580▼ 0.03% USD/UYU40.61— 0.00% USD/PYG6,212▲ 1.77% USD/BOB11.64▲ 3.11% USD/DOP59.54▲ 2.04% USD/CRC441.73▲ 2.16% USD/GTQ7.64▲ 3.41% USD/HNL 26.89 — 0.00% USD/NIO36.62▲ 2.97% USD/VES913.46▼ 0.57% USD/PAB1.00— 0.00% USD/BZD2.00— 0.00% USD/JMD157.69▲ 3.00% USD/TTD6.70▲ 2.17% EUR/BRL6.48▼ 0.60% BRENT 86.35 ▼ 3.38% WTI 79.75 ▼ 0.52% IRON ORE 161.91 — — COPPER 5.54 ▼ 1.58% GOLD 3,617 ▼ 0.95% SILVER 41.70 ▼ 3.37% SOY 1,231 ▲ 0.14% CORN 449.25 ▲ 3.45% WHEAT 593.75 ▲ 2.90% COFFEE 274.90 ▲ 0.02% SUGAR 17.53 ▼ 0.45% ORANGE JUICE 135.40 ▲ 6.11% COTTON 80.94 ▲ 4.40% COCOA 5,191 ▲ 1.29% BEEF 224.60 ▲ 0.72% CATTLE 334.25 ▼ 0.35% LITHIUM 54.70 ▲ 5.23% PETR4 41.30 ▼ 3.21% VALE3 58.41 ▼ 0.12% ITUB4 39.73 ▼ 0.85% BBDC4 13.71 ▼ 0.87% ABEV3 15.94 ▼ 0.87% BBAS3 14.20 ▼ 0.70% B3SA3 14.16 ▼ 0.84% WEGE3 49.91 ▼ 2.39% PRIO3 58.22 ▼ 3.29% SUZB3 55.19 ▼ 0.24% RENT3 28.74 ▼ 0.42% AZZA3 14.58 ▼ 0.34% CSAN3 3.14 ▲ 1.95% RAIZ4 13.90 ▼ 7.33% PCAR3 3.60 ▲ 11.46% GMAT3 4.11 ▼ 1.67% PSSA3 42.91 ▼ 2.39% CVCB3 0.72 — 0.00% POSI3 3.38 ▲ 0.30% SLCE3 16.94 ▼ 3.37% NATU3 4.55 ▲ 1.56% BRKM5 2.91 ▲ 11.92% RANI3 7.81 ▼ 2.50% IBOV 164,796.05 ▼ 0.95% COLCAP 2,452.46 — — IPC MEX 69,355.62 ▲ 1.06% MERVAL 2,848,945 — — USD/BRL 5.93 ▼ 0.02% USD/MXN 19.21 ▲ 0.19% USD/CLP 1,017 ▼ 0.59% USD/COP 3,515 ▲ 6.21% USD/PEN 3.47 ▲ 0.27% USD/ARS 1,580 ▼ 0.02% USD/UYU 40.61 ▲ 3.28% USD/PYG 6,212 ▲ 1.77% USD/BOB 11.64 ▲ 3.11% USD/DOP 59.54 ▲ 2.04% USD/CRC 441.73 ▲ 2.16% USD/GTQ 7.64 ▲ 3.41% USD/HNL 26.89 — 0.00% USD/NIO 36.62 ▲ 2.97% USD/VES 913.46 ▼ 0.57% USD/PAB 1.00 — 0.00% USD/BZD 2.00 — 0.00% USD/JMD 157.69 ▲ 3.00% USD/TTD 6.70 ▲ 2.17% EUR/BRL 6.47 ▼ 0.85% BRENT 86.35 ▼ 3.38% WTI 79.75 ▼ 0.52% IRON ORE 161.91 — — COPPER 5.54 ▼ 1.58% GOLD 3,617 ▼ 0.95% SILVER 41.70 ▼ 3.37% SOY 1,231 ▲ 0.14% CORN 449.25 ▲ 3.45% WHEAT 593.75 ▲ 2.90% COFFEE 274.90 ▲ 0.02% SUGAR 17.53 ▼ 0.45% ORANGE JUICE 135.40 ▲ 6.11% COTTON 80.94 ▲ 4.40% COCOA 5,191 ▲ 1.29% BEEF 224.60 ▲ 0.72% CATTLE 334.25 ▼ 0.35% LITHIUM 54.70 ▲ 5.23% PETR4 41.30 ▼ 3.21% VALE3 58.41 ▼ 0.12% ITUB4 39.73 ▼ 0.85% BBDC4 13.71 ▼ 0.87% ABEV3 15.94 ▼ 0.87% BBAS3 14.20 ▼ 0.70% B3SA3 14.16 ▼ 0.84% WEGE3 49.91 ▼ 2.39% PRIO3 58.22 ▼ 3.29% SUZB3 55.19 ▼ 0.24% RENT3 28.74 ▼ 0.42% AZZA3 14.58 ▼ 0.34% CSAN3 3.14 ▲ 1.95% RAIZ4 13.90 ▼ 7.33% PCAR3 3.60 ▲ 11.46% GMAT3 4.11 ▼ 1.67% PSSA3 42.91 ▼ 2.39% CVCB3 0.72 — 0.00% POSI3 3.38 ▲ 0.30% SLCE3 16.94 ▼ 3.37% NATU3 4.55 ▲ 1.56% BRKM5 2.91 ▲ 11.92% RANI3 7.81 ▼ 2.50%
since 2009
Tuesday, November 24, 2026

Chile Latin America

Chile Bets $3bn on a Make-or-Break Lithium Project

Chile is about to put its state-led model for the world's most coveted battery metal to the test, as a multibillion-dollar lithium project tied to its richest salt flat heads into a make-or-break review.

By · · 5 min read
Chile lithium project Salar Futuro by Codelco and SQM enters environmental review in the Atacama
Chile Bets $3bn on a Make-or-Break Lithium Project.

Chile · Mining

Key Facts

—The filing. NovaAndino Litio plans to lodge the environmental study for its Salar Futuro project with Chile’s regulator in the second half of June 2026.

Free daily brief — no card needed
Get every Chile story in one morning email
We build you a personalized brief around the topics you follow — free for 7 days. Love it? Your first month after that is US$1.

—The price tag. Estimates put the investment at between $2bn and $3.5bn, among the largest in the global lithium business.

—The partners. NovaAndino is the venture of state copper miner Codelco and lithium producer SQM, with the state holding just over half.

—The target. The project aims for annual output of 280,000 to 300,000 tonnes of lithium carbonate equivalent before 2030.

—The technology. It would lean on direct lithium extraction, which promises higher recovery while using far less water.

—The hurdle. The environmental review is lengthy and includes indigenous consultation in the Atacama, with no guaranteed timeline.

Chile is about to put its state-led model for the world’s most coveted battery metal to the test, as a multibillion-dollar lithium project tied to its richest salt flat heads into a make-or-break review.

Chile sits on some of the planet’s best lithium, the silvery metal at the heart of electric-car batteries. Turning that advantage into lasting income is the harder part, and a new project is where the country’s strategy will be tested.

In the second half of June, a venture called NovaAndino Litio plans to file the environmental study for a project named Salar Futuro. It is the centrepiece of Chile’s plan to keep its place at the top of the global lithium market.

What the lithium project involves

Salar Futuro is large by any measure. Estimates of the investment range from two billion to three and a half billion dollars, placing it among the biggest lithium developments anywhere.

The goal is to lift annual production to between 280,000 and 300,000 tonnes of lithium carbonate equivalent before 2030. That would cement the Atacama salt flat as the single most important source of the metal in the country.

The project also marks a technological shift. Rather than relying only on the slow evaporation ponds that have long defined the desert, it would use direct lithium extraction, a method that pulls the metal out faster and returns more water to the basin.

That speed matters commercially. Faster processing lets producers respond more quickly to swings in global prices, a real edge against rivals in Argentina and Australia.

A test of Chile’s state-led bet

The structure behind the project is the story’s most interesting part. NovaAndino Litio is a joint venture between Codelco, the state-owned copper giant, and SQM, the established private lithium producer.

The state holds just over half of the venture, formalised at the end of 2025. The arrangement reflects Chile’s national lithium strategy, which requires majority state participation in new projects while still relying on private expertise to run them.

It is a balance many resource-rich countries talk about but few pull off. Take a bigger public share of the wealth without scaring away the companies and capital needed to dig it out.

There is also a hard deadline driving the urgency. SQM’s existing leases on the salt flat run only to 2030, and the new venture is meant to carry production through to 2060 without a damaging gap.

Demand, meanwhile, keeps climbing. SQM lifted its own sales-growth guidance for the year to fifteen percent and pointed to a tight balance between global supply and demand for the metal.

Salar Futuro is where that ambition gets tested in practice. Officials and analysts alike describe it as the trial that will show whether the public-private model can actually deliver.

The road through review

Filing the study is only the start of a long journey. Chile’s environmental review process is thorough and often slow, and the first draft of this study reportedly runs past five thousand pages.

A central part of the process is consultation with the indigenous communities of the Atacama. Their concerns about water and land carry real weight, and the company says listening to them is essential to getting the project right.

For investors, the timing is the key risk. The 2030 production goals depend on how smoothly the review moves, and delays would hand ground to faster-moving competitors abroad.

For a foreign reader, the takeaway is broader than one salt flat. This is a real-world test of whether a country can tighten its grip on a strategic resource and still build at the speed the market demands.

Frequently Asked Questions

What is the Salar Futuro project?

It is a lithium development in Chile’s Atacama salt flat, run by the Codelco-SQM venture NovaAndino Litio. Estimated at two to three and a half billion dollars, it aims to produce up to 300,000 tonnes of lithium carbonate equivalent a year before 2030.

Why does it matter for Chile?

Lithium is central to electric-car batteries, and Chile wants to keep its lead in the global market. The project tests whether the state can capture a bigger share of the wealth without driving away the private partners and capital it needs.

What could slow it down?

The environmental review is lengthy and includes consultation with Atacama indigenous communities, with no fixed timeline. Delays would threaten the 2030 production targets and cede ground to rivals in Argentina and Australia.

Connected Coverage

Chile’s New Lithium Deal: State Takes Bigger Role in Key Battery Metal

Albemarle Files $3.1B Chile Lithium Extraction Permit

This article was produced by The Rio Times’ automated AI newsroom. Editorial responsibility: Matthias Camenzind, Publisher and Editor-in-Chief. The Rio Times also runs Ask Rio Times, which answers from 100,000+ of our own articles, the daily Latin America Power Map, and prediction-market odds on elections and markets.. How we use AI · Report an error

RT
Ask Rio Times
17 years of Latin America reporting, on demand.
Open the full Ask Rio Times →
The Rio Times · Power Map
See who really holds power in Latin America
Click to open the Power Map →

Brazil runoff date: Sunday, October 25, poll closing times and when results start · Brazil runoff polls: Flávio 51%, Lula 49% · Kalshi and Polymarket odds

Rotate for Best Experience

This report is optimized for landscape viewing. Rotate your phone for the full experience.